Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

LEED-Green-Associate Exam Dumps - LEED Green Associate Exam (LEED GA)

Go to page:
Question # 65

Which of the following does a facility operator need in order to optimize water consumption?

A.

Submetering systems

B.

Schedules of the occupants

C.

Operating times of the building

D.

Fixture cutsheets of waterless urinals

Full Access
Question # 66

Which label or certification indicates reduced water consumption for appliances?

A.

ASHRAE 90.1

B.

GREENGUARD

C.

ISO 14001:2015

D.

ENERGY STAR

Full Access
Question # 67

Which of the following represents a unit of carbon dioxide equivalent that is reduced, avoided, or sequestered to compensate for emissions occurring elsewhere?

A.

Green power

B.

Demand response

C.

Carbon offsets

D.

Renewable energy

Full Access
Question # 68

Which of the following may be awarded to a Green Building professional who "distinguishes professional leadership, contribution to the standards of practice and body of knowledge and continual improvement in the field"?

A.

LEED Fellow

B.

LEED Green Associate

C.

LEED for Homes Green Rater

D.

LEED AP

Full Access
Question # 69

Which of the following strategies contributes to reducing heat island effect and managing rainwater runoff?

A.

A vegetated roof

B.

White cement roof pavers

C.

A rainwater collection system

D.

Shading structures that include photovoltaic panels

Full Access
Question # 70

What is the primary purpose of using low-emitting partitions in office buildings?

A.

To reduce COâ‚‚ levels

B.

To increase thermal comfort

C.

To increase spread of daylight

D.

To reduce volatile organic compounds (VOCs) levels

Full Access
Question # 71

A building manager is comparing the operating cost of the existing boiler to the purchase and operation of a new and more efficient boiler. The building manager discovers that although the upfront cost is significant, purchasing the new boiler would drastically decrease the cost of running and operating the system. This exercise is called

A.

life-cycle costing

B.

value engineering

C.

integrated design

D.

life-cycle assessment

Full Access
Question # 72

Which of the following processes should a project team use to establish synergy among systems and components?

A.

Comprehensive

B.

Interactive

C.

Integrative

D.

Systematic

Full Access
Go to page: