New Year Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

LEED-Green-Associate Exam Dumps - LEED Green Associate GAFRE Exam (LEED GA)

Searching for workable clues to ace the USGBC LEED-Green-Associate Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-Green-Associate PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 97

What is the primary purpose of using low-emitting partitions in office buildings?

A.

To reduce COâ‚‚ levels

B.

To increase thermal comfort

C.

To increase spread of daylight

D.

To reduce volatile organic compounds (VOCs) levels

Full Access
Question # 98

Which methodology is used to evaluate and study the economic performance of a building or system over its entire life?

A.

Energy costing

B.

Triple bottom line

C.

Materials assessment

D.

Life cycle assessment

Full Access
Question # 99

Which of the following actions Is a strategy to reduce construction waste?

A.

Perform a waste stream audit

B.

Use materials with a high recycled content

C.

Develop a construction waste management policy

D.

Hire a consultant to sort construction waste off site

Full Access
Question # 100

The LEED Pilot credit library plays an important role in the continuous evolution of LEED by

A.

developing new credits for U.S. projects only

B.

achieving the next threshold for exemplary performance

C.

limiting the number of times that a credit category appears in the rating system

D.

providing U.S. Green Building Council (USGBC) with feedback on achievability of proposed credits

Full Access
Question # 101

Which of the following scenarios would potentially help a project earn the most LEED points?

A.

Renovate an abandoned shopping mall in a low-density area outside the city

B.

Build an office and apartment building near an interstate highway and an existing shopping mall

C.

Renovate a large building in a diverse, walkable business district and central transit connectivity

D.

Build a low-density project on a greenfield site outside the city in order to mitigate environmental impact

Full Access
Go to page: