Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

LEED-Green-Associate Exam Dumps - LEED Green Associate GAFRE Exam (LEED GA)

Searching for workable clues to ace the USGBC LEED-Green-Associate Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-Green-Associate PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 17

Which of the following is a component of the Promote Sustainable and Regenerative Material Resource Cycles impact category?

A.

Move to Cyclical, Non-Depleting Material Cycles

B.

Protect Human Health Globally and Across the Built Environment Life Cycle

C.

Protection and Restoration of Water Regimes and Natural Hydrological Cycles

D.

Greenhouse Gas (GHG) Emissions Reduction from the Embodied Energy of Materials

Full Access
Question # 18

What plumbing fixture eliminates water use?

A.

Ultrasonic toilet

B.

WaterSense labeled toilet

C.

Low-flow lavatory

D.

Composting toilet

Full Access
Question # 19

During the pre-design phase of a three-story office building, the project team determines that the anticipated energy use of the proposed building will exceed the Owner's Project Requirements (OPR). What strategy should the project team consider in order to lower the building's energy use?

A.

Increase the square footage of the building

B.

Maximize daylighting opportunities with properly sized and oriented windows

C.

Use valid survey protocols to assess occupants' satisfaction with the indoor environment

D.

Monitor and verity performance to ensure that building systems are functioning as designed

Full Access
Question # 20

What is a reason to clearly identify the project boundary?

A.

To define the limits of site disturbance

B.

To define the building envelope

C.

To give priority for certification to projects with a smaller footprint

D.

To determine the total area of the project classified as a brownfield

Full Access
Question # 21

Which term describes misinformation presented to consumers to portray a product or policy as being more environmentally friendly than it is?

A.

Biomimicry

B.

Greenwashing

C.

Green infrastructure

D.

Environmental certification

Full Access
Question # 22

Which is an example of regenerative design?

A.

Passive house energy building

B.

A building with a recycling program

C.

A project that uses sustainable materials

D.

A building that generates electricity and sends the excess to the grid

Full Access
Question # 23

Light trespass beyond the project boundary can be prevented by the use of

A.

flood light fixtures

B.

up-lighting fixtures

C.

shielded light fixtures

D.

increasing the number of light fixtures

Full Access
Question # 24

What standard ensures adequate ventilation is supplied to building occupants?

A.

ASHRAE 55

B.

ASHRAE 62.1

C.

ASHRAE 90.1

D.

ASHRAE 189.1

Full Access
Go to page: