Searching for workable clues to ace the USGBC LEED-Green-Associate Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-Green-Associate PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 17

Which of the following is an Environmental Concern when referring to Energy and Atmosphere?

A.

Ventilation levels

B.

Occupant comfort

C.

Resource depletion

D.

Use of native species

Full Access
Question # 18

Which of the following is the most important phase of the integrative process?

A.

Design Phase

B.

Operation Phase

C.

Discovery Phase

D.

Construction Phase

Full Access
Question # 19

What do team members enhance by collaboration during the integrative process?

A.

Project duration

B.

Life-cycle costs

C.

Construction costs

D.

Efficiency and effectiveness of systems

Full Access
Question # 20

A large commercial facility is experiencing high water usage rates. The building manager decides to conduct an audit focusing on appliance and process water consumption without compromising operational efficiency. Which of the following strategies should be applied to reduce potable water usage in this type of facility?

A.

Install treated rainwater harvesting systems for use in kitchen operations

B.

Retrofit the cooling towers to use non-potable water

C.

Utilize ENERGY STAR certified washing machines in laundry services

D.

Increase once-through cooling for process equipment

Full Access
Question # 21

When redesigning wall assemblies to meet energy code requirements while improving noise control, which strategy effectively supports both objectives?

A.

Installing single-glazed windows

B.

Using staggered studs

C.

Utilizing insulation with a high U-value

D.

Removing insulation from wall cavities

Full Access
Question # 22

An owner of newly acquired land wants to design a building that uses materials that have minimal impact on the environment. Which of the following strategies would help achieve this goal?

A.

Life-cycle assessment

B.

Life-cycle costingC Simple payback

C.

Environmental assessment

Full Access
Question # 23

In a large site that has a short, intense rainy season and a long, dry season, what component of a collected rainwater irrigation system is most likely to make it cost prohibitive over a conventional system?

A.

Irrigation piping systems

B.

Irrigation control systems

C.

Rainwater storage cisterns

D.

Landscaping plant selection

Full Access
Question # 24

What strategy ranks first in the waste hierarchy to minimize construction waste on a project?

A.

Source reduction

B.

Waste-to-energy

C.

Recycling

D.

Reuse

Full Access