Searching for workable clues to ace the USGBC LEED-AP-BD+C Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-AP-BD+C PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 65

What issue must be present on the project site to achieve Location and Transportation Credit, High-Priority Site, Option 3. Brownfield Remediation?

A.

Mercury containing lamps

B.

Contaminated soil or groundwater

C.

Asphalt construction waste

D.

Asbestos tile and glue

Full Access
Question # 66

Which practice is recommended for protecting HVAC systems during construction to maintain indoor environmental quality and enhance occupant quality of life?

A.

Maintain extreme-heat protection

B.

Use low-emitting materials

C.

Install temporary air filters

Full Access
Question # 67

What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?

A.

Photographs of bicycle network signage and directional signposts

B.

Photographs of the installed bicycle storage and shower facilities

C.

Vicinity map showing bicycle network, route and distance along network to eligible destination(s)

D.

Manufacturer specifications for the chosen bicycle storage facilities, including the number of bicycles supported by each bike rack

Full Access
Question # 68

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,Option 2. Leadership Extraction Practices

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,Option 1. Raw Material Source and Extraction Reporting

C.

Materials and Resources Credit, Building Product Disclosure and Optimization Environmental ProductDeclarations, Option 1. Environmental Product Declarations

D.

Materials and Resources Credit, Construction and Demolition Waste Management, Option 1. Diversion

Full Access
Question # 69

A downtown office building is unable to construct dedicated parking for its occupants. However, the building developer has partnered with a parking garage to offer discounted parking for its occupants. If the discounted parking rate is $450 per month, how much must the rate be for green vehicles for the building to receive one point for Location and Transportation Credit, Green Vehicles?

A.

$90

B.

$225

C.

$360

D.

$405

Full Access
Question # 70

A furniture manufacturer is designing a new line of office chairs and wants to ensure that the products align with circular-economy principles. Which of the following strategies should the manufacturer prioritize to align with the principles of material stewardship?

A.

Use virgin materials for all chair components to ensure reliability

B.

Implement a take-back program for end-of-life chairs

C.

Source only locally available materials to reduce transportation impacts

Full Access
Question # 71

To ensure long-term energy efficiency and grid resilience, which strategy should the project team prioritise first?

A.

Provide a high-performance building envelope

B.

Enrol in a demand-response programme with the local utility

C.

Purchase 100% Renewable Energy Certificates to offset projected electricity use

Full Access
Question # 72

When calculating the reverberation time of a room, which of the following pieces of information is least relevant?

A.

Height and width of room

B.

Noise reduction coefficient of the ceiling surface

C.

Sound absorption coefficient of the floor surface

D.

Operating sound level of nearest HVAC equipment

Full Access
Go to page: