Searching for workable clues to ace the USGBC LEED-AP-BD+C Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-AP-BD+C PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 65

For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

A.

Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimony

B.

Fabric, 5% of product by weight, with stain resistant treatment containing Perfluorinated Compounds (PFCs)

C.

Metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium

D.

Plastic armrests, 30% of product by weight, with added antimicrobial treatment

Full Access
Question # 66

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, when should the Owner’s Project Requirements (OPR) be created and updated?

A.

Prior to beginning design and are generally not updated

B.

Once the project design is completed and edited throughout the project

C.

During predesign and are edited throughout the project

D.

After the design is completed and are generally not updated

Full Access
Question # 67

What role does the LEED AP have when creating the Owner ' s Project Requirements (OPR) document?

A.

Oversees the design team writing the OPR

B.

Authors the OPR with the design team

C.

Publishes the completed OPR

D.

Helps the owner develop the OPR

Full Access
Question # 68

Which of the following is omitted from the assessment while performing preliminary energy modeling?

A.

Massing and orientation

B.

Thermal comfort ranges

C.

Supply sources

D.

Plug and process loads

Full Access
Question # 69

Which of the following will contribute to reducing the heat island effect?

A.

Artificial turf grass

B.

Intensive vegetated roof

C.

Steep sloped roof with initial SRI of 35

D.

Low sloped roof with initial Solar Reflectance Index (SRI) of 64

Full Access
Question # 70

The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced

Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?

A.

Verify that training requirements are completed

B.

Develop systems manual for the commissioned systems

C.

Review contractor submittals for the commissioned systems

D.

Verify installation and performance of the commissioned systems

Full Access
Question # 71

Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

A.

Split Review

B.

Appeal Review

C.

Expedited Review

D.

Credit Interpretation Ruling

Full Access
Question # 72

Incorporating climate resilience in the integrative design process helps improve a project ' s sustainability outcomes by:

A.

Reducing project construction costs

B.

Integrating alternative energy systems more effectively

C.

Identifying site-specific natural hazards early in the design phase

Full Access