Searching for workable clues to ace the USGBC LEED-AP-BD+C Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-AP-BD+C PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 97

A corporate office building is implementing a comprehensive waste management program aimed at achieving zero-waste operations. The building management is evaluating strategies to efficiently manage recyclables, compost organics on-site, and safely store hazardous materials such as batteries and mercury-containing lamps. Which of the following actions should the building management take to further improve the waste management program?

A.

Implement educational workshops on waste sorting and recycling

B.

Mandate individual desk-side recycling bins at all workstations

C.

Centralize waste collection areas to encourage recycling behavior

Full Access
Question # 98

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

A.

A garden space dedicated to industrial food production for use by local communities

B.

A garden space with only one vegetation type and species during the summer for visual interest

C.

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Full Access
Question # 99

An urban development project is planned in a city where the population density is 15,000 people per square mile. The project site is within walking distance of a library, grocery store, school, and public park. The city has invested significantly in pedestrian walkways, enhancing the Walk Score to 90 out of 100. The surrounding area includes a mix of residential, retail, and recreational spaces.

The project team can maximize LEED points in the LTc3: Compact and Connected Development credit by:

A.

Ensuring pedestrian connectivity to at least 11 diverse uses within 0.50 mi. (0.80 km)

B.

Focusing on reducing surface parking to improve urban heat-island effects

C.

Prioritizing bicycle storage facilities to encourage cycling

Full Access
Question # 100

A new Science Education Center is pursuing LEED certification. Which of the following strategies could be submitted to earn an Innovation in Design credit?

A.

The selection of energy-efficient LED fixtures for all of the building ' s lighting

B.

The installation of an air-purifying facade material on the front entrance of the building

C.

The integration of rainwater management strategies to achieve a Regional Priority Credit

D.

The implementation of a comprehensive metering strategy to measure three individual energy end uses

Full Access
Question # 101

A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?

A.

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Indoor Water Use Reduction

B.

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Outdoor Water Use Reduction

C.

Sustainable Sites Credit, Rainwater Management and Water Efficiency Credit, Indoor Water Use Reduction

D.

Sustainable Sites Credit, Rainwater Management and Water Efficiency Prerequisite, Indoor Water Use Reduction

Full Access
Question # 102

Showers are addressed under which prerequisites and/or credits within LEED Building Design and Construction?

A.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Indoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

B.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Water Efficiency Credit, Water Metering

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

D.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Cooling Tower Water Use; and Water Efficiency Credit, Water Metering

Full Access
Question # 103

A Core and Shell developer pursuing the IPc2 Green Leases credit has drafted lease language. Which provision meets the intent of the credit for binding tenant sustainability commitments?

A.

Tenant shall submit quarterly energy and water consumption reports and achieve a minimum 50% waste diversion rate verified through waste hauler documentation.

B.

Owner will provide tenant with LEED design guidelines and green building best-practices handbook within 30 days of lease execution for reference.

C.

Tenant acknowledges that the building has achieved LEED certification and agrees to maintain awareness of sustainable building operations during occupancy.

Full Access
Question # 104

An office building design has demonstrated reductions in landscape water use of 30% over baseline and indoor water use of 40%. These reductions qualify the project for:

A.

Four points for Water Efficiency Credit, Indoor Water Use Reduction

B.

Zero points because the Water Efficiency Prerequisites are not met

C.

One point for Water Efficiency Credit, Outdoor Water Use Reduction

D.

One point for Water Efficiency Credit, Outdoor Water Use Reduction and four points for Water Efficiency Credit, Indoor Water Use Reduction

Full Access