Searching for workable clues to ace the USGBC LEED-AP-BD+C Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-AP-BD+C PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 97

Which of the following features is commonly included in a building’s leak-detection system to enhance water efficiency?

A.

Real-time monitoring and alerts

B.

Water-use prediction algorithms based on weather data

C.

Monthly water-use analysis reports

Full Access
Question # 98

A neighborhood housing development organization has dual goals, promoting occupant ' s health and minimizing

energy costs. What LEED Building Design and Construction, New Construction credit might the LEED AP propose to best achieve the organization ' s dual goals?

A.

Location and Transportation Credit, Access to Quality Transit

B.

Energy and Atmosphere Credit, Optimize Energy Performance

C.

Indoor Environmental Quality Credit, Low Emitting Materials

D.

Indoor Environmental Quality Credit, Daylight

Full Access
Question # 99

Which of the following strategies can be used to decrease the envelope load of a building?

A.

Provide summer solar shading

B.

Maximize daylighting

C.

Decrease opaque wall area

D.

Use economizers for free cooling

Full Access
Question # 100

Which of the following characteristics are a requirement of a compliant water meter?

A.

Must be digital

B.

Must be permanently installed

C.

Must transmit data to a remote location

D.

Must be capable of storing data for 36 months

Full Access
Question # 101

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

A.

A garden space dedicated to industrial food production for use by local communities

B.

A garden space with only one vegetation type and species during the summer for visual interest

C.

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Full Access
Question # 102

Which one of the following represents quality transit service as defined in Location and Transportation Credit, Access to Quality Transit?

A.

A bus stop served by two bus lines Monday through Friday, located 1/8 mi. (0.20 km) from the project building

B.

A rail station served by one train line Monday through Sunday, located 1/2 mi. (0.80 km) from the project building

C.

A rail station served by two train lines Monday through Sunday, located 1 mi. (1.60 km) from the project building

D.

A private shuttle bus stop providing hourly service Monday through Friday to a rail station two hours away, located across the street from the project building

Full Access
Question # 103

A project includes an automatic transfer switch and controls that enable the building’s on-site renewable-energy systems, energy storage, and critical equipment to operate during a power outage. What is this capability called?

A.

Load management

B.

Islanding

C.

Demand response

Full Access
Question # 104

A project team is pursuing points under EAc3: Enhanced Energy Efficiency using a whole-building energy simulation method. When modeling a baseline design, which of the following inputs must be the same as proposed design inputs?

Full Access