Searching for workable clues to ace the USGBC LEED-AP-BD+C Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-AP-BD+C PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 33

A project team is working on a mixed-use development aiming to achieve LEED certification. The client wishes to limit on-site combustion as a strategy for future electrification readiness. The building will include residential units, retail spaces, and a central heating system.

Which of the following strategies should the project team implement to support the goal of electrification readiness and limit on-site combustion?

A.

Include electric vehicle charging stations in the parking area

B.

Utilize a high-efficiency gas boiler for space heating

C.

Implement a solar thermal system for hot water supply

Full Access
Question # 34

A school wants to incorporate natural daylighting in classrooms on all sides of the building. What can the project design team explain to the school district about how this strategy will affect the operational energy cost?

A.

Heat gain will reduce the air conditioning load

B.

Having the lights off reduces the electricity use

C.

Reduction in lighting fixture use reduces re-lamping

D.

There would be passive solar heating benefits to all of the classrooms

Full Access
Question # 35

Which of the following assessments is conducted prior to the completion of the schematic design and explores methods to reduce energy use within a proposed building?

A.

Energy audit

B.

Building systems commissioning (Cx)

C.

Simple box energy analysis

D.

Mechanical systems inspection

Full Access
Question # 36

Which of the following must be included in the Sustainable Sites Credit, Site Assessment?

A.

A targeted Brownfield remedy plan

B.

Historic preservation plan to include neighboring properties

C.

Proximity of vulnerable populations to major sources of air pollution

D.

The surrounding density within a 1/4 mi. (0.40 km) radius of the project boundary

Full Access
Question # 37

Which of the following is a strategy to reduce waste produced by a project?

A.

Design-build

B.

Material reuse

C.

Alternative daily cover

D.

Custom design

Full Access
Question # 38

What building classification requires the energy model to determine the predicted power usage effectiveness (PUE) for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Office

B.

Hospital

C.

Warehouse

D.

Data Center

Full Access
Question # 39

What phase of the integrative process gives the team the greatest chance of success in meeting the project ' s environmental goals cost-effectively?

A.

Design

B.

Discovery

C.

Operations

D.

Construction

Full Access
Question # 40

Which of the following credits can be awarded an Innovation point for Exemplary Performance?

A.

Indoor Environmental Quality Credit, Daylight

B.

Indoor Environmental Quality Credit, Low-Emitting Materials

C.

Indoor Environmental Quality Credit, Minimum Indoor Air Quality Performance

D.

Indoor Environmental Quality Credit, Acoustic Performance

Full Access