Searching for workable clues to ace the USGBC LEED-AP-BD+C Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-AP-BD+C PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 33

Which of the following organizations is responsible for providing alternative compliance paths that reflect regional variations for LEED credits?

A.

U.S. Environmental Protection Agency (EPA)

B.

International Energy Agency (IEA)

C.

U.S. Green Building Council (USGBC)

Full Access
Question # 34

Which of the following is a source reduction strategy to eliminate waste produced by a project?

A.

Custom design

B.

Design-build

C.

Material science

D.

Prefabrication

Full Access
Question # 35

When planning a water-efficient landscape design, the designer should consider including

A.

potable water

B.

sprinkler system

C.

native vegetation

D.

permeable pavement

Full Access
Question # 36

The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?

A.

3%

B.

1%

C.

2%

D.

4%

Full Access
Question # 37

A new athletic facility contains a laundry room which is adjacent to the locker rooms. Which strategy will contribute toward the Interior Cross-Contamination Prevention strategy in Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

A.

Relocate the laundry facility to the basement

B.

Naturally ventilate the laundry space per ASHRAE 62.1-2010

C.

Install particle filters, with a MERV of 13 or higher or F7

D.

Provide a ventilation system specifically for the laundry facility that has no recirculating air

Full Access
Question # 38

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project description, which of the following credits can be achieved with all available points awarded?

A.

LTc3: Compact and Connected Development

B.

EAc1: Electrification

C.

WEc2: Enhanced Water Efficiency

Full Access
Question # 39

The project team is working to reduce the building ' s total energy costs in a cold climate. Which is the best strategy for the project team to consider?

A.

Additional envelope insulation

B.

Window shades

C.

Highly reflective roof

D.

Increased cooling efficiency

Full Access
Question # 40

Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?

A.

A, B, C

B.

B, C, D

C.

C, D, E

D.

A, B, D

Full Access