Searching for workable clues to ace the USGBC LEED-AP-BD+C Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-AP-BD+C PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 81

When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be

A.

included in the calculation

B.

excluded from the calculation

C.

excluded if the total volume is less than 25% of the building being reused

D.

excluded if the total volume is more than 25% of the building being reused

Full Access
Question # 82

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,Option 2. Leadership Extraction Practices

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,Option 1. Raw Material Source and Extraction Reporting

C.

Materials and Resources Credit, Building Product Disclosure and Optimization Environmental ProductDeclarations, Option 1. Environmental Product Declarations

D.

Materials and Resources Credit, Construction and Demolition Waste Management, Option 1. Diversion

Full Access
Question # 83

What percentage of all energy usage is attributable to buildings?

A.

60%

B.

30%

C.

40%

D.

50%

Full Access
Question # 84

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team ' s top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Full Access
Question # 85

The use of lead, mercury, copper and cadmium should be limited because they all

A.

are persistent bioaccumulative toxins

B.

reduce the life cycle assessment of a building

C.

take an unreasonable amount of energy to recycle

D.

interfere with the magnetic instruments in a medical building

Full Access
Question # 86

In the context of community connectivity, the purpose of promoting walkability in urban planning is to:

A.

Foster social engagement and interaction

B.

Improve public health and encourage active lifestyles

C.

Increase urban density and reduce urban sprawl

Full Access
Question # 87

What is the first step to earn the Water Efficiency Credit, Cooling Tower Water Use?

A.

Select air-conditioner condensate for cooling

B.

Calculate cycles of concentration

C.

Identify the maximum number of cycles for the cooling tower or evaporative condenser

D.

Engage a water treatment professional to perform a chemical analysis

Full Access
Question # 88

How can the additional energy needed to increase the ventilation in a building be mitigated?

A.

Use economizer strategies

B.

Use higher-rated MERV filters

C.

Use high-pressure drop filters

D.

Reduce the size of the ventilation ductwork

Full Access