Searching for workable clues to ace the USGBC LEED-AP-BD+C Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-AP-BD+C PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 129

A design team is working on a new building project and is employing an integrated, whole-building approach. The architects want to increase the size of a glazed opening on the south facing wall. Which team members are first

affected by this change?

A.

Civil engineers

B.

Facility managers

C.

Landscape architects

D.

Mechanical engineers

Full Access
Question # 130

Which of the following is an example of nonpotable water that can be effectively used for landscape irrigation to improve water efficiency?

A.

Well water from a private borehole

B.

Dechlorinated swimming-pool water

C.

Street runoff taken directly from storm drains

Full Access
Question # 131

In order for a product to contribute to Materials and Resources Credit, Building Product Disclosure and Optimization, Environmental Product Declarations, Option 1. Environmental Product Declaration, the product needs to be

A.

Forest Stewardship Council (FSC)-certified

B.

cradle-to-cradle certified

C.

third-party verified in a Corporate Sustainability Report (CSR)

D.

critically reviewed life-cycle assessment conforming to ISO 14044

Full Access
Question # 132

The Volatile Organic Compounds (VOC) emissions evaluation criteria for adhesives and sealants should be obtained for wet-applied products installed within:

A.

A non-structural wall

B.

The air or vapor barrier membrane

C.

Storefront systems

Full Access
Question # 133

What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

A.

Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided

B.

Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided

C.

Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year ' s data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

D.

Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year ' s data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Full Access
Question # 134

Which of the following should be evaluated to assess a project’s human-use and health impacts?

A.

Access to essential transportation routes

B.

Proximity to manufacturing plants

C.

Access to medical services

Full Access
Question # 135

Large commercial buildings are most often dominated by

A.

internal loads

B.

lighting loads

C.

external loads

D.

envelope loads

Full Access
Question # 136

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

In addition to the vegetated terraces, the project team is considering installing a green roof with walkways, fountains, and seating areas for patients, visitors, and staff. If the project attempts SSc2: Accessible Outdoor Space, what percentage of the required outdoor space must be vegetated?

A.

20%

B.

25%

C.

30%