Searching for workable clues to ace the USGBC LEED-AP-BD+C Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-AP-BD+C PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 49

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

A.

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.

The project team need not do anything as GBCI already marked it as an " anticipated " credit

Full Access
Question # 50

In the energy modeling of a building envelope, which of the following U-values should be considered as an assembly U-value?

A.

Wall

B.

Steel

C.

Glass

D.

Concrete

Full Access
Question # 51

What requirements are needed to earn Regional Priority credits?

A.

Full name and specialty credential of LEED AP

B.

Points are awarded automatically

C.

Exemplary performance

D.

Related credits registration

Full Access
Question # 52

Which of the following is a source reduction strategy to eliminate waste produced by a project?

A.

Custom design

B.

Design-build

C.

Material science

D.

Prefabrication

Full Access
Question # 53

If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term

bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle

Facilities?

A.

Three

B.

Four

C.

Five

D.

Ten

Full Access
Question # 54

A project team is designing an office building and wants to ensure thermal comfort for occupants, especially in naturally conditioned spaces. How should the design team enhance thermal comfort in the naturally conditioned areas?

A.

Introduce radiant heating panels

B.

Increase air speed

C.

Use low-emissivity windows

Full Access
Question # 55

During a design charrette, community neighbors raise a concern about potential glare resulting from a project ' s highly reflective roof. Which change should the LEED AP recommend to best address these concerns without negatively impacting other LEED credits?

A.

Change the design to incorporate rooftop solar panels

B.

Change the roofing material to a dark material to eliminate the issue

C.

Change the design to reduce the amount of roofing area

D.

Change the design to include a vegetative roofing system

Full Access
Question # 56

Which of the following strategies enhances energy resilience by ensuring that critical loads are powered during a grid outage?

A.

Increase insulation in the building envelope

B.

Install a battery energy-storage system

C.

Implement energy-efficient lighting

Full Access