Searching for workable clues to ace the USGBC LEED-AP-BD+C Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s LEED-AP-BD+C PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 17

A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?

A.

Use ground source heat pump

B.

Install efficient plumbing fixtures

C.

Ergonomics design for classrooms and computer rooms

D.

Purchase all materials locally to minimize road transportation

Full Access
Question # 18

In the context of biophilic design, providing access to outdoor views contributes to enhancing occupant quality of life because doing so:

A.

Reduces indoor air pollutants by acting as a natural ventilator through improved air exchange

B.

Helps improve concentration and cognitive function by offering a visual connection to natural elements

C.

Promotes thermal comfort by allowing occupants to visually gauge outdoor weather conditions

Full Access
Question # 19

Which of the following are all considered regular building occupants?

A.

Staff, primary/secondary students, volunteers, and residents

B.

Staff, primary/secondary students, higher education students, and residents

C.

Higher education students, retail customers, periodic volunteers, and visitors

D.

Residents, volunteers, retail customers, and staff

Full Access
Question # 20

Which system is eligible for EAc4: Renewable Energy?

A.

Tidal energy conversion

B.

Municipal solid waste combustion

C.

Ground-source heat pumps

D.

Passive solar and daylighting strategies

Full Access
Question # 21

Which of the following projects are eligible for LEED certification?

A.

Prefabricated sandwich panel house

B.

New office building900 ft² (83.6 m²)

C.

Houseboat

D.

Mobile home

Full Access
Question # 22

The owner of a large multi-building property is seeking LEED certification. In determining the LEED project boundaries the LEED AP may include non-contiguous parcels of land if

A.

the parcels are used for temporary uses such as parking or staging that is owned and managed by a third party

B.

the parcels directly support or are associated with normal building operations and are accessible to the project ' s occupants

C.

the parcels are part of an existing public preservation easement or resource protection area that is directly adjacent to the LEED project boundary

D.

the parcels are part of a land trust or conservation organization for which the LEED project provides financial support for in the Sustainable Sites Credit, Site Development Credit, Protect or Restore Habitat, Option 2. Financial Support

Full Access
Question # 23

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

A.

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.

The project team need not do anything as GBCI already marked it as an " anticipated " credit

Full Access
Question # 24

Which of the following credit categories identifies environmental issues that are most relevant for a project ' s chapter area or country?

A.

Location and Transportation

B.

Energy and Atmosphere

C.

Sustainable Sites

D.

Regional Priority

Full Access