Question # 57

When drilling is necessary, what is the purpose of pilot holes?

A.

To assess the strength of the mounting material

B.

To give the screws direction

C.

To check for electrical wiring

D.

To wear out the smaller drill bits before the larger ones

Full Access
Question # 58

During a technical site survey for an installation with a display, information gathered should include:

A.

Color of the walls

B.

Receptionist name and phone number

C.

Ceiling height and construction method

D.

Rules governing use of the freight elevator

Full Access
Question # 59

What is inserted between structural building elements to provide a secure mounting point for products?

A.

Post-tension cables

B.

Grade 5 bolts

C.

Poured pan concrete

D.

Wood blocking

Full Access
Question # 60

You have a cable with a part number "RGB5C-25-CM." What is the wire gauge of this cable?

A.

25 AWG

B.

5 AWG

C.

25 cm

D.

250 AWG

Full Access
Question # 61

What are key considerations when determining projector placement? (Choose all that apply.)

A.

Throw distance

B.

Type of lens

C.

Offset value

D.

Standard deviation

Full Access
Question # 62

Which part of the eye enables people to see at night?

A.

retina

B.

cones

C.

rods

D.

Iris

Full Access
Question # 63

Under normal circumstances, a ground wire carries _____.

A.

a line level signal

B.

a dangerously high voltage

C.

current to the main distribution panel

D.

no charge

Full Access
Question # 64

_____ change an image's format from one resolution to another.

A.

Line Drivers

B.

Scan converters

C.

Switchers

D.

Scalers

Full Access
Go to page: