Question # 49

After there is an approved labor change to a project, what should the project manager do NEXT?

A.

update the schedule

B.

order the equipment

C.

issue an invoice for the change

D.

inform the purchasing department

Full Access
Question # 50

What is defined by a work breakdown structure (WBS)?

A.

Project scope

B.

Project budget

C.

Project schedule

D.

Project resources

Full Access
Question # 51

According to AVIXA's AV Performance Verification standard, at what point should the loudspeaker transformer tap setting be verified?

A.

Closeout

B.

Pre-integration

C.

Post-integration

D.

Systems integration

Full Access
Question # 52

Which addressing scheme is used to define a fixed, routable IPv4 address that is locally assigned?

A.

static

B.

DHCP

C.

link-local

D.

DHCP reservation

Full Access
Question # 53

Determining the expectations of the end users of a presentation space is called a(n):

A.

Needs analysis

B.

Program report

C.

Executive summary

D.

Performance verification

Full Access
Question # 54

Which of the following terms is defined as a lamp that produces light by heating a filament in a sealed glass housing?

A.

Incandescent Lamp

B.

Fluorescent Lamp

C.

CFL Lamp

D.

LED Lamp

Full Access
Question # 55

After installation, the system does not pass audio. Based on the information in the drawing, what is the MOST LIKELY cause?

A.

cable lengths

B.

system needs a DSP

C.

phantom power is required

D.

speaker requires a 70 V transformer

Full Access
Question # 56

What section of the color chart is used to calibrate brightness? Select the answer by clicking on the appropriate area of the chart

Full Access