Question # 33

Based on this image, what is the aspect ratio for WUXGA?

A.

1.6:1

B.

1.78:1

C.

1.85:1

D.

2.35:1

Full Access
Question # 34

This screen has a 16:9 aspect ratio. How close should the nearest viewer be positioned?

A.

3'3" (1 m)

B.

6'7" (2 m)

C.

4'8" (1.4 m)

D.

5'11" (1.8 m)

Full Access
Question # 35

In order to mount a projector so that it is horizontally centered with the suspended screen, the technician should look at which drawings in the plans?

A.

detail

B.

sections

C.

elevations

D.

reflected ceiling

Full Access
Question # 36

Which agreement typically includes installation materials and workmanship against failure for a stipulated period after the installation is complete?

A.

Service warranty

B.

System warranty

C.

Preventive warranty

D.

Manufacturer's warranty

Full Access
Question # 37

For ceiling speakers with a 90° effective coverage angle, a ceiling height of 3 m (10 ft), and an ear height of 1.2 m (4 ft), the spacing for a 50% coverage or edge-to-center layout is:

A.

1.8 m (6 ft)

B.

3.0 m (10 ft)

C.

3.6 m (12 ft)

D.

6.0 m (20 ft)

Full Access
Question # 38

"Shock Loads" for equipment mounts refer to

A.

suspended equipment not electrically isolated from Its mounting structure.

B.

sudden additional loads from earthquakes or personnel hanging from the mounts.

C.

calculated counterweight required to balance an offset load on a cantilever mount.

D.

calculated isolation required to eliminate vibration otherwise transferred to the building structure.

Full Access
Question # 39

An integrator has to upgrade a camera system in an existing board room. What is the MOST IMPORTANT information to gather on the site visit?

A.

cable length

B.

ambient lighting placement

C.

resolution of camera system

D.

distance from the lens to first participant

Full Access
Question # 40

A client requests for a project to be completed earlier than initially scheduled. What should the AV contractor do FIRST to address this change?

A.

deny the request and work to the original agreed schedule

B.

allocate more resources to meet the earlier completion date

C.

provide a request for change (RFC) to the client to approve the change to the schedule

D.

provide a change order (CO) to the client outlining changes to the project and any additional costs

Full Access