Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

FlashArray-Implementation-Specialist Exam Dumps - Pure Certified FlashArray Implementation Specialist (FAIS) Exam

Searching for workable clues to ace the Pure Storage FlashArray-Implementation-Specialist Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s FlashArray-Implementation-Specialist PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 41

Which FlashArray//XL DirectMemory Modules (DMMs) configuration condition is true?

A.

DMMs cannot be installed in a DirectFlash Shelf (DFS).

B.

DMMs are only compatible with //XL 170.

C.

DMMs use different drive slots to regular DirectFlash modules.

D.

DMMs are required for baseline array initialization.

Full Access
Question # 42

An Implementation Engineer is installing a FlashArray//XR4 and needs to add an extra card to support a second DirectFlash Shelf.

What will be the resulting pair of interfaces?

A.

ETH6 and ETH7

B.

ETH5 and ETH6

C.

ETH4 and ETH5

D.

ETH8 and ETH9

Full Access
Question # 43

A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack. What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?

A.

The Shelf requires at least 180V to operate and Will NOT power on With 120V.

B.

The shelf can be fully supported by 120V for the duration of its service life.

C.

The shelf can operate temporarily on 120V, but 208/240V should be used as soon as it's available.

Full Access
Question # 44

Which command should the Implementation Engineer run to set the maintenance tag?

A.

puremaintenance schedule array --timeout < timeout >

B.

puremaintenance tag --maintenance

C.

purealert tag --schedule --maintenance

D.

puremessage flag set --maintenance

Full Access
Question # 45

After an Implementation Engineer installs a new FlashArray and runs health checks, they see that Phonehome and Remote Assist are NOT working correctly. Which outbound port needs to be open for all management ports (physical and virtual)?

A.

80

B.

443

C.

123

Full Access
Question # 46

During an intra-series upgrade from //XR3 to //XR4, which command should the Implementation Engineer run to verify host connectivity before removing the secondary controller?

A.

purehost list --hostless

B.

iobalance --sampletime 30

C.

host_connectivity --hosts

Full Access
Question # 47

In a situation where iSCSI cards need to be re-used during a controller upgrade, which is a valid transfer path?

A.

XR2 > XR3

B.

M > XR2/3

C.

M > XR2

Full Access
Question # 48

When performing a FlashArray//X50R3 to FlashArray//XL130R5 upgrade, what should the Implementation Engineer do with the 20 DirectFlash Modules from the FlashArray//X50R3?

A.

Insert them into slots 20-39 in the FlashArray//XL130R5 one at a time, allowing parity to reach 100% before inserting the next.

B.

Insert them into slots 0-19 in the FlashArray//XL130R5 one at a time, allowing parity to reach 100% before inserting the next.

C.

Return the drives to Pure Storage after the upgrade script has completed the data migration phase.

D.

Keep the drives installed in the FlashArray//X50R3 and connect it to the FlashArray//XL130R5 as an external DirectFlash Shelf.

Full Access
Go to page: