Halloween Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

FlashArray-Implementation-Specialist Exam Dumps - Pure Certified FlashArray Implementation Specialist (FAIS) Exam

Searching for workable clues to ace the Pure Storage FlashArray-Implementation-Specialist Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s FlashArray-Implementation-Specialist PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 17

What hardware should the Implementation Engineer find in the upgrade kit in order to perform an //X to //XL NDU?

A.

2 QSFP cables / 3 Mellanox cards / 20 DFMDs

B.

3 QSFP cables / 4 Mellanox cards / 10 DFMDs

C.

4 QSFP cables / 2 Mellanox cards / 20 DFMDs

Full Access
Question # 18

Before proceeding with a controller upgrade, phonehome logs must be sent. What command will verify that the logs have been sent?

A.

purearray phonehome --check

B.

purearray phonehome --list

C.

purearray phonehome --status

Full Access
Question # 19

A customer needs to have arrays installed and configured with ActiveCluster and ETH replication. The installation document contains 3 IP addresses. How many additional IP addresses are needed?

A.

4

B.

5

C.

6

Full Access
Question # 20

What should an Implementation Engineer do when installing rails in a threaded-hole rack?

A.

Use the positioning studs

B.

Install the rails as is

C.

Make an adjustment to the rack

Full Access
Question # 21

A customer wants to expand the capacity of their FlashArray//X10 from 5/5 to 11/11. Which is the correct action to take?

A.

Evacuate and swap one pack at a time.

B.

Perform a drive-by-drive swap of the modules.

C.

Install a swing shelf with loan capacity to evacuate to.

Full Access
Question # 22

An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?

A.

Primary

B.

Secondary

C.

Standby

Full Access
Go to page: