What hardware should the Implementation Engineer find in the upgrade kit in order to perform an //X to //XL NDU?
Before proceeding with a controller upgrade, phonehome logs must be sent. What command will verify that the logs have been sent?
A customer needs to have arrays installed and configured with ActiveCluster and ETH replication. The installation document contains 3 IP addresses. How many additional IP addresses are needed?
What should an Implementation Engineer do when installing rails in a threaded-hole rack?
A customer wants to expand the capacity of their FlashArray//X10 from 5/5 to 11/11. Which is the correct action to take?
An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?