Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

FlashArray-Implementation-Specialist Exam Dumps - Pure Certified FlashArray Implementation Specialist (FAIS) Exam

Searching for workable clues to ace the Pure Storage FlashArray-Implementation-Specialist Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s FlashArray-Implementation-Specialist PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 33

Which Purity command can be used to validate I/O is balanced across initiators?

A.

purehost list --balance

B.

purehost iobalance --check

C.

purehost monitor --balance

Full Access
Question # 34

After racking a new FlashArray with one data pack, how should DirectFlash modules be installed?

A.

Starting in bay 10, left to right.

B.

Starting in bay 0, left to right.

C.

Starting in bay 19, right to left.

D.

Starting in bay 4, left to right.

Full Access
Question # 35

Which command should an Implementation Engineer use to allow Support access to an array?

A.

purearray connect --remoteassist

B.

purearray remoteassist

C.

purearray remoteassist --connect

Full Access
Question # 36

What is the minimum number of physical Ethernet ports per controller that should be dedicated to the file-services interface to ensure redundancy?

A.

0

B.

2

C.

4

D.

6

Full Access
Question # 37

An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array.

What is the required service depth clearance for the front and rear panels of the FlashArray//XR4?

A.

Front panel: 216 mm (8.5 in.), Rear panel: 530 mm (20.9 in.)

B.

Front panel: 530 mm (20.9 in.), Rear panel: 530 mm (20.9 in.)

C.

Front panel: 530 mm (20.9 in.), Rear panel: 216 mm (8.5 in.)

D.

Front panel: 216 mm (8.5 in.), Rear panel: 216 mm (8.5 in.)

Full Access
Question # 38

An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis.

What type of controller is required to complete the upgrade?

A.

FLASHARRAY//X50 R4, SE

B.

FLASHARRAY//X50 R4, NS

C.

FLASHARRAY//X50 R4, Base

D.

FLASHARRAY//X50 R4, NVMe

Full Access
Question # 39

An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversion Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?

A.

To widen an existing write group.

B.

To fill out enclosure bays.

C.

To replace a missing shipment.

Full Access
Question # 40

Refer to the following output:

Ping Successful with CCM

What does this indicate?

A.

Controller has successfully connected to Pure1

B.

Controller has successfully connected to the Fusion Fleet Coordinator

C.

Cross-controller link has successfully connected between controllers

D.

Controller has successfully connected to the ActiveCluster mediator

Full Access
Go to page: