Question # 4

You have directed one of your testers to construct a "smoke test" to execute against new builds prior to starting formal testing. This is an example of which software development lifecycle activity?

[1]

A.

Project management

B.

Software development and maintenance

C.

Change and configuration management

D.

Technical support

Full Access
Question # 5

The test team is using a distributed model for testing.

What is the primary factor you should consider with this model? [1]

A.

Alignment of methodologies

B.

Co-location of test team

C.

Provision of growth opportunities for the individual testers

D.

Planned vs. actual hours

Full Access
Question # 6

What is a "depth-first" risk-based testing technique? [1]

A.

Highest risk test cases are executed first

B.

All risk items are tested at least once

C.

Lowest risk test cases are executed first

D.

Non-functional test cases are executed first

Full Access
Question # 7

The Test Manager must assemble team members that have which of the following characteristics? [1]

A.

Thrive in a routine, structured environment

B.

Will not change the severity of a defect report

C.

Will spark informal cross training among themselves

D.

Possess identical skill sets

Full Access
Question # 8

While mining the defect database for patterns of problems in the last release, a Test Manager notices that many of the most damaging failures were caused by defects

injected during the low-level design phase.

Which of the following actions will likely give this project the most effective solution to this problem? [3]

A.

Increased static analysis during the implementation phase

B.

Mandatory reviews of all important design work products

C.

Formal inspections of the code modules affected by the last release

D.

Increased white-box coverage during system testing

Full Access
Question # 9

Which of the following aspects should test progress metrics be mapped to? [1]

A.

Lines of code

B.

Exit criteria

C.

Post-implementation defect discovery rate

D.

Defect resolution rate

Full Access
Question # 10

Your company just won a contract to create a new sales application and has committed to a very aggressive delivery timeline. Due to the quick turnaround your primary stakeholder wants to be

heavily involved in the design and is very anxious to see the outcome. Because of this, your company has decided to use a spiral development approach. You have a defined test policy and

typically use an analytical approach to testing, however, this approach will not work with the development approach.

What test strategy should be utilized? [3]

A.

Model-based

B.

Methodical

C.

Standard-compliant

D.

Reactive

Full Access
Question # 11

Which of the following is a factor that is likely to increase the test estimate? [1]

A.

Use of a new technology

B.

A requirement for high level test documentation

C.

Assigned personnel who are experienced on working with similar projects in similar environments

D.

Static test data

Full Access
Question # 12

Which testing metric identifies defect density? [1]

A.

Project

B.

Product

C.

Process

D.

People

Full Access
Question # 13

Which of the following software characteristics are possibly revealed through the application of a open source static analysis tool? [1]

A.

Coding standard violations

B.

Memory leaks

C.

Concurrency thresholds

D.

Timing dependencies

Full Access
Question # 14

Which of the following are primary activities in conducting product risk analysis? [1]

A.

Risk testing, risk management

B.

Risk identification, risk assessment

C.

Risk identification, risk testing

D.

Risk management, risk assessment

Full Access
Question # 15

Your last project was released three months ago and used a risk-based approach. In production, a number of serious failures in low risk areas have occurred.

What is the most important lesson to be learned from this information? [2]

A.

The "lessons learned" session should have been conducted prior to deployment.

B.

A broader cross-functional team should contribute to the risk analysis.

C.

The project manager should have set stakeholder expectations for serious failures.

D.

Future projects should test the lower risk areas first.

Full Access
Question # 16

Which of the following is a typical use of risk analysis? [1]

A.

Identifying the appropriate depth of testing for each identified risk

B.

Deciding what personnel should be assigned to which tests

C.

Determining the design of the tests used to mitigate each identified risk

D.

Forecasting the product delivery date

Full Access
Question # 17

You are the Test Manager for a critical system and are using a risk-based approach for this project.

Which of the following would most clearly convey the current status to project stakeholders? [3]

A.

A scatter chart showing test execution status

B.

A Pareto graph showing requirements coverage

C.

A pie chart showing residual risk

D.

A bar graph showing defect density

Full Access
Question # 18

Which work experience is likely to develop the necessary skills to effectively test a software system? [3]

A.

Being a member of the production group that supported the previous release of the system

B.

Being the developer of testing tools used for automation

C.

Being the current Project Manager for the system

D.

Being a former Test Manager

Full Access
Question # 19

You are testing a new product that will turn on the windshield wipers of a car when the sensorsdetect there is moisture on the windshield. Depending on the information

returned from the sensors, the wipers will be turned on at one of the following speeds: slow intermittent, medium intermittent, fast intermittent, slow constant, medium

constant, fast constant. Your team has identified the following test condition:

Test Condition 1.1.1 - Verify that the windshield wipers can go from slow constant to fast constant speed when the amount of moisture increases appropriately.

Your team has defined the following steps for a test case for this test condition:

1. Set the moisture sensor to request slow constant

2. Increase the moisture to set the sensor to request fast constant

3. Verify that the wipers respond with fast constant speed

Given this information, which of the following statements is correct? [2]

A.

This test case is traceable to the test condition and provides 100% requirements coverage of the defined test condition.

B.

There is not enough information in the test condition to define a test case.

C.

This test case is not traceable to the test condition.

D.

The test case is traceable to the test condition and provides 100% statement coverage of the defined test condition.