Searching for workable clues to ace the Construction Specifications Institute CDT Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s CDT PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 17

Which of the following participants is involved in the Integrated Project Delivery (IPD) method?

A.

Authority having jurisdiction

B.

Commissioning agent

C.

Contractor

D.

Inspector

Full Access
Question # 18

A facility manager needs to replace a broken insulated glazing unit in an existing facility. Which source would be most appropriate for determining where and how to order the new unit?

A.

Record drawings

B.

Manufacturer's representative

C.

Project manual

D.

Record submittals

Full Access
Question # 19

What requirement is set by authority, custom, or general consensus that is also an established accepted criterion?

A.

Building code

B.

Quality control standard

C.

Reference standard

D.

Specification master

Full Access
Question # 20

Which type of warranty is used to provide a remedy to the owner for material defects or failures after completion and acceptance of construction?

A.

Warranty of title

B.

Implied warranty of merchantability

C.

Purchase warranty

D.

Extended warranty

Full Access
Question # 21

Which bid form component ensures equal consideration, transparency, and flexibility while awarding a contract, but also manages cost during execution for undefined and unforeseen construction conditions?

A.

Bid security and substitution

B.

Add and deduct alternatives

C.

Allowances and unit prices

D.

Liquidated damages and combined bids

Full Access
Question # 22

When is the owner entitled to stop the work?

A.

If the architect/engineer fails to represent owner properly

B.

If the contractor fails to correct work that is not compliant with the contract documents

C.

If the contractor is presumed to be bankrupt

D.

If there is a safety problem on the site

Full Access
Question # 23

What can value analysis be used for?

A.

To provide the owner with the lowest construction cost.

B.

To enhance project value or reduce initial or long-term cost.

C.

A phase for future work to allow higher quality items up front.

D.

To change the perceived value by owner and stakeholder.

Full Access
Question # 24

Under a single prime contract, shop drawings should be routed to the architect/engineer from whom?

A.

Contractor

B.

Material supplier

C.

Owner

D.

Subcontractor