Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

API-580 Exam Dumps - API 580 - Risk Based Inspection

Go to page:
Question # 4

The objective of RBI is to:

A.

determine what loss of containment incident could occur, and how likely the incident could occur.

B.

identify the worst possible consequences of a major leak or equipment failure, including safety, environmental, and/or economic consequences.

C.

determine the damage mechanisms that could occur and cause equipment failure that could lead to loss of containment.

D.

determine the likelihood that a major leak could result in a fire, an explosion, or another major consequence.

Full Access
Question # 5

An RBI assessment of new equipment or a new project may:

A.

not be useful because there is no inspection history.

B.

be needed in order to define the risk criteria to be used in service.

C.

be conducted only after 1000 hours of operation to establish operating and inspection data.

D.

yield useful information on potential future risks.

Full Access
Question # 6

Risk mitigation is defined as:

A.

estimated risk before and after repairs and replacements.

B.

finding, listing, and characterizing elements of risk management.

C.

modifying inputs to the risk matrix.

D.

selecting and implementing measures to modify risk.

Full Access
Question # 7

Inspection and decommissioning are forms of:

A.

risk mitigation.

B.

probability mitigation.

C.

consequence mitigation.

D.

risk analysis.

Full Access
Question # 8

RBI as a risk-based approach focuses attention specifically on:

A.

the equipment and associated damage mechanisms.

B.

on-stream inspections in lieu of internal inspections.

C.

inspection intervals based on a percentage of equipment life.

D.

consequence-based inspection intervals.

Full Access
Go to page: