Question # 9

Which of the following codes provide requirements and limitations for implementing RBI programs? (Select all that apply)

A.

API 653

B.

API 573

C.

API 570

D.

API 510

E.

API 578

Full Access
Question # 10

Which of the following are essential elements of an RBI program? (Select all that apply)

A.

Management system for personnel qualifications

B.

Documented method of determining failure probability and consequence

C.

Management system for maintaining documentation and analysis updates

D.

Process hazard analysis to verify the adequacy of process safety

Full Access
Question # 11

Which of the following would be the minimum expectations of contractors hired to implement an RBI program?

A.

Certification in accordance with API RP 580

B.

Documented training in damage mechanisms

C.

Certification of corrosion/materials specialist to API RP 571

D.

Documented training and suitably qualified personnel

Full Access
Question # 12

In cases where inspection technology cannot adequately and/or cost-effectively mitigate risks, what is the next step to consider?

A.

Other risk mitigation approaches

B.

The equipment should be replaced

C.

A new risk assessment should be conducted

D.

The inspection interval should be shortened

Full Access
Question # 13

Which of the following may make it impractical to reduce some risks to an acceptable level?

A.

Technology

B.

Labor contracts

C.

Production needs

D.

Regulatory requirements

Full Access
Question # 14

The consequence analysis in an RBI program is performed to:

A.

discriminate between equipment items on the basis of the significance of a potential failure.

B.

establish on the basis of consequence a prioritized ranking of equipment items for RBI plans.

C.

establish on the basis of consequence a relative risk ranking of equipment subject to failure.

D.

provide management with numerous options for limiting the consequence of a potential failure.

Full Access
Question # 15

In RBI, residual risk factors for loss of containment include:

A.

human error.

B.

maintenance plans.

C.

unknown or unanticipated damage mechanisms.

D.

secondary effects from nearby units.

E.

change of ownership.

Full Access
Question # 16

Which aspect of risk assessment is common to all types and levels of RBI?

A.

Logic models

B.

Risk plots

C.

Expert opinion

D.

Calculated risk levels

Full Access