Searching for workable clues to ace the BCS TM3 Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s TM3 PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 4

During a test process improvement initiative, defect information is gathered to perform defect cluster analysis.

Which aspect is most likely being targeted for improvement?

A.

To improve the defect removal efficiency.

B.

To reduce the total number of defects.

C.

To better understand risk and focus testing, as part of risk-based testing.

D.

To minimise the costs associated with defects.

Full Access
Question # 5

Factors that are important to take into account when performing test estimation include:

i. The quality of the test basis

ii. The availability of test automation

iii. The amount of rework required

iv. The distribution of testing across several locations

The various factors can be grouped by characteristic. Examples of characteristics include:

A.

Test context

B.

Test results

C.

Product

D.

Development processWhich factor is related to which characteristic?

E.

A = i, B = ii, C = iii, D = iv

F.

A = iv, B = iii, C = i, D = ii

G.

A = iv, B = iii, C = ii, D = i

Full Access
Question # 6

Which of the following statements about test management activities for an iterative development model is false?

A.

With testware the focus is on acceptance criteria and definition of done. The level of documentation is minimal.

B.

The test approach is embedded within iterations, with a focus on adaptability and feedback.

C.

Reporting is done at project milestones.

D.

Roles are integrated; facilitator or coach typically replace the traditional test manager.

Full Access
Question # 7

Following up on the situation, the team lacks drive and is performing tasks too slowly. You have been asked to recruit an extra person into the team. Which of the following team roles would be most appropriate to enhance the team?

A.

A person with the ability to complete tasks

B.

A test process improvement consultant

C.

A person with in-depth technical skills

D.

A person who brings new ideas to the team

Full Access
Question # 8

Your company is considering purchasing a test tool suite from a respectable vendor. Your manager has searched the internet for comparable products, but none of them meet his specific requirements. A tool demonstration has been arranged for next week and your team has been invited to attend. The tool suite consists of a test management tool, test execution tool, and a requirements management tool. There is a possibility of adding a performance testing tool at a later stage.

You have decided to attend the demo but raise some issues beforehand regarding expectations.

Which two issues from the options provided below should at least be raised?

A.

What are the problems we are trying to address?

B.

Do we have a set of tool requirements to validate the tool against?

C.

How will the implementation be organised?

D.

Which project will be selected to perform the tool pilot?

E.

Is customized training available?