Question # 17

A multistory warehouse is to be converted into a high-tech office building. The owners propose a variety of services and flexibility to tenants, including cable/internet, fiber optic communications, dish/satellite, and security systems.

In order to accommodate this broad array of electronic and communications services, the architect should recommend which of the following electrical and communications distribution systems?

A.

Poke-through system

B.

Cellular deck system

C.

Raised access floor system

D.

Flat cable wiring system

Full Access
Question # 18

Which of the following need to be considered to enhance the acoustic design of an office building? Check the four that apply.

A.

Location of noise-sensitive areas relative to noise-producing elements

B.

Type of the structural floor system construction between floors

C.

Minimize the use of steel stud framing and gypsum board for interior partitions

D.

Use of exterior natural or constructed barriers to reduce impact from external noise sources, absorption, and increase reverberation times

E.

Acoustical properties of interior floor, wall, and ceiling finish materials

F.

Selection of interior finish treatments that will decrease sound absorption

Full Access
Question # 19

A one-story residence in a dry climate with cold winter nights is designed with an unconditioned dirt floor crawlspace utilizing underfloor plumbing and HVAC ductwork. The owner is interested in using a concrete slab-on-grade floor instead of the pier-and-beam concrete floor over an open crawlspace as originally designed.

What are the impacts of changing the design to a slab-on-grade floor system? Check the two that apply.

A.

It will have warmer floors in the evenings.

B.

It will have more steel reinforcing.

C.

It will limit future plumbing flexibility.

D.

It will limit the types of flooring finishes available.

E.

It will allow for better moisture control.

F.

It will allow for HVAC ductwork installation.

Full Access
Question # 20

An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by

a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces,

administrative spaces and public/lobby spaces.

The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza

must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.

The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The

building entrance faces northwest, convenient to the parking but not visible from the highway.

The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would

include a second building (2 story, 80,000 BGSF) and/or a parking deck.

Other considerations for the project include:

    Protected tree requirements are defined in the PD document.

    Easy pedestrian access must be provided from Sycamore Boulevard.

    All required parking for the clinic must be accommodated on site.

    Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).

    Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.

    All service equipment needs to be screened; see PD document for restrictions.

    Signage opportunities are important to the client.

    Acoustical privacy is a concern of the healthcare system.

The following resources are available for your reference:

    Drawings, including a perspective, plans, and exterior elevations

    Building Program, including client's departmental program and detailed program for Treatment 01 (Infusion)

    Exterior Material Cost Comparisons

    Planned Development Document

    IBC Excerpts, showing relevant code sections

    ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design

During the city planning review process, the city planner discovers that two of the building elevations deviate from the building design requirements set forth in the Planned Development Document. The owner is granted a variance for only one of the non-compliant facades. The facade must face the Pedestrian Access Easement.

A.

Northeast Elevation

B.

Northwest Elevation

C.

Southwest Elevation

D.

Southeast Elevation

Full Access
Question # 21

Which statement accurately describes the use of an electrical conduit?

A.

A separate ground wire is required to avoid a shock hazard when using steel conduit.

B.

Aluminum conduit is a cost-effective alternative to steel conduit because it can be used in all locations steel conduit is used.

C.

Rigid polyvinyl chloride conduit provides a system ground path.

D.

Steel conduit is used to support and protect the conductors.

Full Access
Question # 22

A midrise concrete frame structure originally designed for an area of low seismic risk must be redesigned for use in an area of high seismic risk.

Which one of the following modifications will have the highest construction cost?

A.

Adding substantial shear walls

B.

Redesigning as a ductile moment-resisting frame

C.

Redesigning as a braced-frame structure

D.

Bracing a soft story

Full Access
Question # 23

A site has been engineered with a 1:20 grade.

Which of the following sidewalk designs would be the most cost-effective way to get from the top to the bottom and still be in compliance with the accessibility standards?

A.

Switchback ramps at 1:12 with a handrail

B.

Cutting diagonally across the slope at 1:10 with a handrail

C.

Cutting diagonally across the slope at 1:12 with no handrail

D.

At the same grade as the slope with no handrail

Full Access
Question # 24

Refer to the exhibit (urban commercial site sketch).

In the urban commercial site shown in the sketch, which is the most convenient location for a truck entrance and exit from the site?

A.

A

B.

B

C.

C

D.

D