Question # 9

Refer to the exhibit (lighting fixtures with Kelvin temperatures and CRI values).

An architect is evaluating downlighting for a new restaurant. The owner requests the lighting cast a warm light, be energy efficient, and allow for the colors of the chef's food to accurately appear while guests are seated.

What fixture manufacturer satisfies the owner's request?

A.

Mornath Industries (Fluorescent, 2800K, 79 CRI)

B.

Luxenardo (Metal Halide, 5000K, 90 CRI)

C.

Bea-Lele Lighting (LED, 2800K, 91 CRI)

D.

VeriSPEK Fixtures (Halogen, 3000K, 95 CRI)

Full Access
Question # 10

The architect's greatest contribution to good seismic design is in the design of which of the following?

A.

Structural components and connections

B.

Building's interior partition arrangement

C.

Building's plan and cross-sectional configuration

D.

Site location and building orientation

Full Access
Question # 11

Which of the following roofing types is the most appropriate for installation during below-freezing weather conditions on a roof with less than a 2:12 slope?

A.

A cold-tar built-up roof

B.

A self-sealing shingle roof

C.

A ballasted EPDM roof

Full Access
Question # 12

An architect is developing a master plan for a small area of a city located on a lake. The master plan has four open sites being considered for a proposed park. The city needs to avoid incoming noise pollution at the park and provide a variety of activities for the city.

Click on the open site that is appropriate for a city park with baseball fields and nature trails.

Full Access
Question # 13

The use of a central computer system to monitor a building's heating and cooling demands will do which one of the following?

A.

Eliminate the use of a facility manager

B.

Interactively select the least energy-intensive system or combination of systems

C.

Increase the cost of energy consumption

D.

Be primarily for solar-heating and natural-cooling systems

Full Access
Question # 14

When designing a three-story wood-frame home located in a high wind region, the addition of a green roof with a two-foot soil bed would do which one of the following?

A.

Increase the structure's resistance to overturning

B.

Require additional tie-downs

C.

Increase the structure's resistance to racking

Full Access
Question # 15

A new four-story apartment building is being designed on a site that has solid bedrock subsurface conditions. The client requested the lowest cost of installation, highest energy efficiency, the shortest round trip time, and minimized loss of usable building space.

Which elevator type should the architect recommend?

A.

Conventional hydraulic elevator

B.

Gearless traction elevator

C.

Dual jack hole-less hydraulic elevator

D.

Machine-roomless elevator

Full Access
Question # 16

In the design of a project, the architect should do which of the following in order to respond to the requirements imposed by governmental authorities that have jurisdiction over the project?

A.

Implement a code search checklist to capture key design code information.

B.

Implement a staff training program that will guarantee compliance with all applicable codes.

C.

Include a provision in the construction contract that delegates code compliance to the contractor.

D.

Include a provision in the architect's contract with the owner that ensures compliance with all applicable codes.

Full Access