Question # 17

A customer experience manager wants to share a technician's phone number with a customer. The customer needs to be able to see the phone number in the customer experience portal and be able to communicate directly with the technician.

The customer reports that they are not able to see the phone number in the portal.

Which two actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Verify that the customer is nor on the exclusion list.

B.

Ensure the customers Communication Type is set to Both

C.

Within the Customer Portal, update Show Resource Phone to Yes.

D.

Verify that the Main Phone field is populated.

E.

Ensure the customer's communication preference is set to Allowed

Full Access
Question # 18

Your organization recently started using the Universal Resource Scheduling feature. You enabled the Lead entity for scheduling.

You need to have a dedicated tab in the schedule board to see all the unscheduled leads.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Full Access
Question # 19

You work for a digital billboard manufacturing company. When manufacturing is completed, the new digital billboards are shipped to a client site for installation. As the dispatcher for your company, you need to identify and schedule the different resources that are required to complete the installation of the digital billboard.

The installation of a billboard is a complicated process and requires a large team of resources all with different skills. These installations occur frequently, so you want to dispatch the resources for installations as efficiently as possible.

You need to configure multi-resource scheduling.

Which three steps should you perform, in sequence, to enable the multi-resource scheduling? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Select and Place:

Full Access
Question # 20

The ability to work offline with a mobile device is key requirement for your customer. You need to ensure entities and fields are available for offline use. What should you do?

A.

Access the Microsoft Power Platform admin center to make changes in the Mobile Configuration section for Offline functionality.

B.

Create a new mobile offline profile for initial use.

C.

Access the Offline Profile from the Mobile section in Customizations.

D.

Once the system configuration is correctly set up. add the Offline Security role to the user who needs offline access.

Full Access
Question # 21

Your organization wants to use the new Microsoft Dynamics 365 Field Service mobile app. You need to install this app for the technicians.

In order to run the initial tests, you install the mobile app and connect with the Sandbox environment to verify that everything is working as expected.

Now, you want to connect the mobile app to the Production environment

Which two actions should you take? Each correct answer presents a part of the solution.

NOTE: Each correct selection is worth one point

A.

Stay logged in, and select Reconfigure to delete data and clear cache from your device.

B.

Sign out, and then log in as your new production user.

C.

Go to the main menu, then select the Person icon.

D.

Go to the main menu, then select the Settings icon.

Full Access
Question # 22

Litware, Inc. designers sometimes have to schedule an experienced technician and trainee to go out to a customer's home to take measurements.

One of their customers, wants a kitchen and bathroom remodel completed during the same timeframe. The customer has asked for Litware, Inc. to have both measurements completed at the same time.

Currently, Litware, Inc. does not any technicians with both kitchen remodeling and bath remodel skills. Litware, Inc. wants to use the new Quick Book functionality to schedule multiple resources to this work order.

Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Full Access
Question # 23

Litware, Inc. needs your company to suggest a best practice for implementing multi-resource work order scheduling for kitchen cabinet installation jobs, that includes a new, inexperienced technician.

In addition, they need a resource skilled in cabinet installation and cabinet resurfacing.

Using the requirements provided, which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Full Access
Question # 24

During requirement and design discussions, Litware. Inc. Subject Matter Experts (SMEs) discuss a specific scenario.

A customer purchases an HVAC system along with a 1-year service contract and a 3-year extended warranty. After 9 months, the system shuts down and the customer cannot get it started back up. The customer calls into Litware, Inc. to inform them the system is down and he needs a service technician to come out to fix the unit.

The SMEs want to know which functionality within Dynamics 365 Field Service can handle the scenario.

Which configuration steps should you take in each of the categories listed? To answer, drag the appropriate configuration to the correct category in the answer area. Each element may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.