Searching for workable clues to ace the CIPS L4M7 Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s L4M7 PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 57

MRP software is a powerful tool for managing material requirements of manufacturing processes. To keep the software function well, an organisation must have appropriate input data. Which of the following are the inputs of MRP software? Select THREE that apply.

A.

Master production schedule

B.

Bill of materials

C.

Capacity requirement plan

D.

Payrolls information

E.

Facilities management

F.

Inventory records

Full Access
Question # 58

Which of the following code systems is commonly used by governments as a basis for their Cus-toms tariffs and for the collection of international trade statistics?

A.

The International Mobile Equipment Identity

B.

The Harmonized Commodity Description and Coding System

C.

Global Trade Item Number

D.

Global Location Number

Full Access
Question # 59

XYZ Ltd is a retailer in the US. Their customers' demand for Thanksgiving and Christmas decora-tions usually rises in the end of the year. This irregular demand results in more required storage space for finished goods during peak seasons. Which of the following are possible solutions for dealing with required additional space?

1. Maximising aisle width

2. Keeping high buffer stock throughout the year

3. Maximising flexibility in warehouse layout

4. Installing mezzanine floor

A.

1 and 3 only

B.

2 and 4 only

C.

1 and 2 only

D.

3 and 4 only

Full Access
Question # 60

Which is the best definition of reorder point?

A.

The point at which stock will fall to zero minus lead-time

B.

The point when one unit of stock remains in stock

C.

The point when stock reaches zero

D.

The level inventory at which an order must be made

Full Access
Question # 61

Which of the following is the definition of work in progress inventory?

A.

Inventory that has finished the production process

B.

Inventory introduced into production but not completed as of the stocktake date

C.

Inventory not yet introduced into the production process

D.

Obsolete inventory

Full Access
Question # 62

The purchase-order lead time is the...?

A.

Period between receiving a customer order and producing the products

B.

Time needed to correct errors in the defective products

C.

Period between placing an order and its delivery

D.

Period between receiving a customer order and delivering the items

Full Access
Question # 63

Which of the following is the Japanese word for ‘billboard’ or ‘signboard’?

A.

Muda

B.

Kaizen

C.

Poka-Yoke

D.

Kanban

Full Access
Question # 64

Which of the following are critical factors that must be considered when evaluating warehouse or storage locations?

    The cost of the proposed location

    Who owns the storage location or warehouse

    Access to transport networks

    The number of windows in the building

A.

1 and 3 only

B.

2 and 3 only

C.

2 and 4 only

D.

1 and 4 only

Full Access