Searching for workable clues to ace the ASQ CSSBB Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s CSSBB PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 41

After completion of the control phase, an improved process must continue to be monitored for which of the following reasons?

A.

One or more of the constraints might move.

B.

The process owner needs time to learn the new process.

C.

It is less costly to improve the process a second time using the same resources.

D.

The next pilot run will address a new constraint.

Full Access
Question # 42

What is the availability of a machine that has 650 hours of downtime due to adjustments and equipment failures over a period of 4,272 hours?

A.

0.36

B.

0.64

C.

0.85

D.

0.87

Full Access
Question # 43

Two catalysts are being analyzed to compare their effect on the yield of a chemical process. Catalyst 1 is currently being used, and catalyst 2 is being considered as it is a less expensive alternative, provided the yield is the same. An experiment is run with 10 observations for each catalyst and t = -1.06. Assuming equal variances and α = 0.05, which of the following conclusions can be made?

A.

t0.025,18 = -2.101 < -1.06 < 2.101, and yields are different

B.

t0.025,18 = -2.101 < -1.06 < 2.101, and yields are not different

C.

t0.05,18 = -1.734 < -1.06 < 1.734, and yields are different

D.

t0.05,18 = -1.734 < -1.06 < 1.734, and yields are not different

Full Access
Question # 44

A team should use a prioritization matrix in order to respond effectively to which of the following situations?

A.

All process variables are equally important

B.

Only a few variables impact the process

C.

Driving and restraining forces need to be understood

D.

Multiple variables might have an impact on process output

Full Access
Question # 45

What tool is used to identify relationships that exist between groups of data?

A.

Tree diagram

B.

Interrelationship digraph

C.

Matrix diagram

D.

Prioritization matrix

Full Access
Question # 46

After a project team completes a gap analysis, the next step is to

A.

develop improvement goals

B.

communicate the results to management

C.

revise the project’s operational goals

D.

create a value stream map

Full Access
Question # 47

Which of the following factors within an organization would most likely reduce the likelihood that Six Sigma projects will be successfully implemented?

A.

The overall corporate strategy is not clearly defined.

B.

There are not enough Black Belts currently employed by the organization.

C.

Project status meetings are not held frequently enough.

D.

Effective communication within an organization is emphasized at all levels.

Full Access
Question # 48

The following control chart was developed by a continuous improvement team.

The process in this chart shows a pattern known as

A.

a shift

B.

a trend

C.

periodicity

D.

stratification

Full Access