Searching for workable clues to ace the International Code Council 93-Tall-Mass-Timber-Buildings Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s 93-Tall-Mass-Timber-Buildings PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 17

For Type IV-A, IV-B, and IV-C construction, each of the following materials on the exterior side of mass timber exterior walls is required to be noncombustible except:

A.

insulation.

B.

exterior cladding.

C.

architectural trim.

D.

water-resistive barrier.

Full Access
Question # 18

In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are permitted to be reduced by _____ where supporting a roof only.

A.

30-minutes

B.

45-minutes

C.

1-hour

D.

2-hours

Full Access
Question # 19

Refer to the figure by clicking on the EXHIBIT button above.

In Type IV-B construction, unprotected portions of mass timber as shown in the Figure is limited to an area equal to not more than what percentage of the base floor area?

A.

15%

B.

20%

C.

30%

D.

40%

Full Access
Question # 20

Each of the following is true for special inspection of mass timber construction except:

A.

continuous special inspection is required for bolted connections.

B.

periodic special inspection is required for concealed connections.

C.

periodic special inspection is required for the erection of mass timber construction.

D.

periodic special inspection is required to verify use of pre-drilled holes for threaded fasteners where required.

Full Access
Question # 21

The building owner shall be responsible for each of the following for fire safety during construction except:

A.

completion of a daily fire safety inspection at the project site by the site safety director.

B.

documentation and maintenance on-site of each inspection’s results until a certificate of occupancy has been issued.

C.

securing documentation in a fire- and water-resistant safe until a certificate of occupancy has been issued.

D.

making documentation immediately available on-site for presentation to the fire code official upon request.

Full Access
Question # 22

The time, in minutes, contributed to the fire resistance rating by the noncombustible protection of mass timber building elements, components, or assemblies, shall be established through a comparison of assemblies tested using procedures set forth in ASTM Standard:

A.

E114

B.

E119

C.

E920

D.

D3498

Full Access
Question # 23

Fire-resistance ratings of members and assemblies can be established by all of the following except:

A.

calculations per IBC Section 722.

B.

fire-resistance testing in accordance with ASTM E84.

C.

fire-resistance designs documented in approved sources.

D.

prescriptive designs of fire-resistance-rated building elements, components or assemblies as prescribed in IBC Section 721.

Full Access
Question # 24

In Type IV-C construction, the fire-resistance rating provided by protection over a connection can be determined by which of the following?

A.

Testing the fasteners used in the assembly.

B.

Testing the protection covering the connection.

C.

Calculating the temperature rise of the structural element being protected.

D.

Calculating the temperature rise of the supported member used in the connection.