Searching for workable clues to ace the International Code Council 93-Tall-Mass-Timber-Buildings Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s 93-Tall-Mass-Timber-Buildings PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 9

Which of the following products is not included in the definition of mass timber?

A.

Solid sawn lumber

B.

Prefabricated wood I-joists

C.

Glued laminated timber

D.

Cross-laminated timber

Full Access
Question # 10

Refer to the figure by clicking on the EXHIBIT button above.

In Type IV-B construction, based on a 900 sq. ft. floor area, a 30 ' room width, and a 12 in. x 18 in. beam as shown in the Figure, the maximum length of the unprotected portion of the mass timber ceiling (dimension X) is _____ feet.

A.

2

B.

4

C.

6

D.

8

Full Access
Question # 11

Buildings of Types IV-A, IV-B, and IV-C construction designed to be greater than six stories above grade plane shall meet which of the following requirements for fire safety practices during construction?

A.

Standpipes shall be provided in accordance with IFC Section 3313.

B.

The IFC specifically requires a portable water supply.

C.

Required exterior wall coverings on all floor levels more than 2 levels below the floor under construction, including mezzanines.

D.

At least two layers of noncombustible protection, where noncombustible protection is required for the building element, on all mass timber more than 4 stories below the uppermost floor under construction.

Full Access
Question # 12

When Type X gypsum board is used as noncombustible protection over mass timber on the building ' s exterior walls, which of the following fasteners are permitted?

A.

Galvanized nails of minimum 12 Gage with a 7/16-inch head of sufficient length to penetrate the mass timber a minimum of 1 in.

B.

Galvanized nails of minimum 16 Gage with a 7/16-inch head of sufficient length to penetrate the mass timber a minimum of 1 in.

C.

Screws which comply with ASTM C 1002 (Type S, Type W, or Type G) of sufficient length to penetrate the mass timber a minimum of 3/4 in.

D.

Screws which comply with ASTM C 1002 (Type S, Type W, or Type G) of sufficient length to penetrate the mass timber a minimum of 7/8 in.

Full Access
Question # 13

Refer to the figure by clicking on the EXHIBIT button above.

The exterior wall section shown in the Figure provides the prescribed noncombustible protection required by which Construction Type?

A.

Type IV-A

B.

Type IV-B

C.

Type IV-C

D.

Type IV-HT

Full Access
Question # 14

Periodic special inspection of sealants or adhesives as specified by the International Building Code Section 703.7 shall be conducted at which of the following locations?

A.

At “joints” as defined in IBC Section 202.

B.

Where they are a required component of a tested fire-resistance-rated assembly.

C.

At abutting edges and intersections of mass timber building elements required to be fire-resistance rated.

D.

At abutting intersections of mass timber building elements and building elements of other materials where one or the other are required to be fire-resistance rated.

Full Access
Question # 15

Regarding water supply for the protection of buildings under construction, when combustible building materials of the building under construction are delivered to a site, the minimum fire flow provided shall be _____ gpm.

A.

100

B.

200

C.

500

D.

750

Full Access
Question # 16

In Type IV-C construction, a connection between two members of the primary structural frame supporting a floor is required to be protected to achieve a minimum fire-resistance rating of:

A.

1 hour

B.

1-1/2 hours

C.

2 hours

D.

3 hours