Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

350-601 Exam Dumps - Implementing Cisco Data Center Core Technologies (350-601 DCCOR)

Go to page:
Question # 9

An engineer m9ust configure SAN connectivity in Cisco UCS manager. The requirement is to specify the WWPN of the storage array and set the zoning type to single initiator multiple targets. The engineer must also configure interrupt handling and queues of the vHBA interface. Which two Cisco UCS policies should be used to configure the settings? (Choose two.)

A.

SAN connectivity policy

B.

boot policy

C.

Fibre Channel adapter policy

D.

storage connection policy

E.

vHBA policy

Full Access
Question # 10

A Cisco UCS C-Series server needs to be installed in a data center. The server must be managed by using Cisco UCS Manager with a single cable for management and data traffic. Which set of commands must be run on the server after a physical connection is established?

A)

B)

C)

D)

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 11

Which statement describes the rolling EPLD upgrade on a cisco MDS 9000 Series switch?

A.

The standby supervisor module is capable of performing the upgrade

B.

All module on the switch are disrupted.

C.

An EPLD upgrade is nondisruptive.

D.

Only the modules that are being upgraded are disrupted.

Full Access
Question # 12

Refer to the exhibit. User1 and User2 are connected to VTEP1 switch. The users can reach the WEB server. The monitoring tool shows degrading network performance and excessive traffic is sent from User2 to reach the WEB server. Which storm control percentage levels must be used to suppress traffic from User2 and allow all traffic types from User1?

A.

Level 0 on Eth1/1 and Level 100 on Eth1/2

B.

Level 0 on Eth1/2 and Level 0 on Eth1/5

C.

Level 0 on Eth1/2 and Level 100 on Eth1/1

D.

Level 100 on Eth1/1 and Level 100 on Eth1/5

Full Access
Question # 13

An engineer needs to install a new package on a Cisco Nexus 9000 Series Switch. What is the impact of running the install commit <filename> command on the switch?

A.

The previous package that was n use is deleted from bootflash.

B.

The package is used in the running configuration

C.

The package is used after the switch is restarted

D.

The switch is restarted after the upgrade is complete

Full Access
Question # 14

Refer to the exhibit. A network engineer must monitor the traffic from the server on VLAN 80.

All source traffic from the server must be captured on the monitoring device. Which configuration set meets these requirements?

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 15

An engineer is performing a configuration on a Cisco Nexus 5000 Series Switch. The requirement is for the current Fibre Channel IDs in VSAN 120 to be saved across reboots. The Cisco environment also must integrate with a third-party solution that requires persistent Fibre Channel IDs for the VSAN. The WWN of the Cisco switch must be 33:e8:00:05:30:00:16:df and its Fibre Channel ID 0x070128. Which command set meets these requirement?

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 16

Refer to the exhibit. An engineer is configuring Cisco Data Center Network Manager to automate the provisioning of Cisco Nexus 9000 Series Switches. The engineer must configure user access for network engineers to permit device operations in Interface Manager. The solution must hide Admin and Config Menu items in Interface Manager Which two roles must be assigned to the network engineers to meet these requirements? (Choose two.)

A.

San-admin

B.

network-operator

C.

network-admin

D.

access-admin

E.

global-admin

Full Access
Go to page: