Searching for workable clues to ace the VMware 2V0-13.25 Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s 2V0-13.25 PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps
During an initial design workshop with stakeholders, the architect was provided with an overview of the current state and other information required to proceed to the design phase.
The architect has assumed that the solution will need to support high availability for workloads.
Given the assumption, which statement should the architect document as a risk?
An architect is tasked with designing a new VMware Cloud Foundation (VCF) solution. During workshops with the customer, the following requirements were captured:
• REQ01: The solution must provide a self-service catalog.
• REQ02: The solution must support the segregation of the Development and Production resources (networks, virtual machines, users).
When documenting the design decisions, which statement should the architect include in order to help meet these requirements?
An architect is designing a VMware Cloud Foundation (VCF) fleet. The following information has been provided by the customer:
Due to budget constraints, the solution must utilize the existing server hardware.
The existing server hardware consists of server models from the same vendor but different generations.
There are ten servers available for use in this solution.
Management and Business workloads should be hosted in different clusters.
What design decision should the architect make for the lifecycle management of the solution based on this information?
An architect is planning resources for a new cluster that will be part of an existing workload domain. The new cluster will provide resources for several new workloads, including a mission-critical application consisting of five resource-intensive virtual machines.
The following requirements were provided for the new cluster:
• The solution must ensure that the new workload cluster meets the company's availability standard of N+1.
• The solution must minimize the overall investment in hardware.
Which two design recommendations should the architect make to meet the stated requirements? (Choose two.)
As part of the VMware Cloud Foundation (VCF) logical design, the architect has determined that the VCF Private Cloud will encompass multiple VCF instances contained within a single VCF Fleet. The architect documented the following requirements when using VCF Operations:
Monitoring downtime must be minimized.
Alerting downtime must be minimized.
Which design decision supports these requirements?