Special Month End Sale - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 75vsure

Plat-Arch-202 Exam Dumps - Platform Development Lifecycle and Deployment Architect

Searching for workable clues to ace the Salesforce Plat-Arch-202 Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s Plat-Arch-202 PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 4

Which two actions will contribute to an improvement of code security? Choose 2 answers

A.

Use two developers to review and fix current code vulnerabilities.

B.

Implement a pull request and secure code review.

C.

Integrate a static code security analysis tool in the CI/CD process.

D.

Hire a company specialized in secure code review the current code.

Full Access
Question # 5

Universal Containers are concerned that after each release, reports and dashboards seem to roll back to previous versions. Executives spend many hours crafting these dashboards to perfectly meet their needs, and are now questioning the Salesforce platform ' s ability to save things, even data records.

What can the Salesforce architect advise to stop the rollbacks from happening?

A.

Use a third-party data warehouse.

B.

Remove the executive ' s ability to change reports, and only allow developers to do that.

C.

Ensure report metadata is exported daily and that it is merged into the developer branches before the next release.

D.

Back up all the reports just before the release, then reimport them after the release.

Full Access
Question # 6

An architect has been working on a large project for the past 6 months. This project must be live by the end of the current month.

Which two planning techniques should the architect use to ensure all metadata changes deploy smoothly and on time? Choose 2 answers

A.

Create a new sandbox and perform a test deployment to that environment.

B.

Ensure all code that is being deployed is checked into source control.

C.

Upload a change set from sandbox to production as early as possible.

D.

Validate the final deployment package against production prior to go-live

Full Access
Question # 7

Universal Containers (UC) has been on the org development model with scratch orgs are already enabled, but they haven ' t been taking advantage of the scratch orgs.

Now UC is ready to move to the package development model. What step must be done by an administrator?

A.

In setup, switch both the Enable Dev Hub and Enable 2nd-Generation Managed Packages to Enabled.

B.

In setup, switch the Enable Unlocked Packages to Enabled, keep the Enable Second Generation Managed Packages as disabled.

C.

In setup, switch the Enable Unlocked Packages and Second-Generation Managed Packages to Enabled.

D.

In setup, switch the Enable Dev Hub to Enabled, then switch the Enable Source Tracking for Scratch Orgs to Enabled.

Full Access
Question # 8

Universal Containers is about to begin the release of a major project. To facilitate this, they have several sandboxes to make their deployment train. These sandboxes are a mix of preview and non- preview instances.

What should the architect recommend?

A.

Refresh all non-preview sandboxes during the release preview window.

B.

No advice needed, mixing instance types is important for regression testing.

C.

Refresh all non-preview sandboxes when the release management team has time.

D.

Contact support to rollback the release when Salesforce upgrades the sandboxes.

Full Access
Go to page: