Question # 4

Who is the best person to serve as the Indoor Environmental Quality Manager to successfully implement Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program?

A.

The LEED AP

B.

A general contractor

C.

The building engineer

D.

A commissioning (Cx) agent

Full Access
Question # 5

What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?

A.

Five years from the date that Green Business Certification Inc. (GBCI) initially certified the building

B.

12 months from the date that GBCI initially certified the building

C.

Five years from the date that the project was initially registered with GBCI

D12 months from the end date of the last performance period of the initial certification

Full Access
Question # 6

Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\

A.

Perform the Small Storm Hydrology method to calculate the runoff volume on 95% of the site

B.

Minimize impervious cover to be maximum 80% of the site area for the 95th percentile of storm events with design alterations or verification

C.

Harvest and treat enough rainwater to cover 25% of the impervious surfaces, for the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

D.

Include rain gardens on the project site for 15% of the of the impervious surfaces, in order to absorb the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

Full Access
Question # 7

What requirement must be met when creating a demand response program that satisfies Energy and

Atmosphere Credit, Demand Response?

A.

Demonstrate a load shift reduction of 5% in the building

B.

Permanently reduce the energy consumption in the building by 5%

C.

Have the building management sign a two-year demand response enrollment

D.

Create a comprehensive plan for meeting the contractual commitment during a demand response event

Full Access
Question # 8

Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?

A.

Air temperature and humidity

B.

Air speed and radiant temperature

C.

Air temperature and energy consumption

D.

Radiant temperature and energy consumption

Full Access
Question # 9

When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

A.

Measure and document waste in weight or volume

B.

Use replacement value as the metric for ongoing waste

C.

Extrapolate data from one month of the performance period

D.

Do not allow tenant waste outside the building's waste program to be included

Full Access
Question # 10

If a manufacturer does not specify the calibration interval for the utility meters used for benchmarking building energy performance, the assessment team may specify a reasonable calibration interval not to exceed

A.

one year

B.

two years

C.

three years

D.

five years

Full Access
Question # 11

Which of the following LEED AP Operations and Maintenance Water Efficiency Credits has exemplary performance?

A.

Water Efficiency Credit, Water Metering

B.

Water Efficiency Credit, Cooling Tower Water Use

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction

D.

Water Efficiency Credit, Outdoor Water Use Reduction

Full Access
Question # 12

A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be

submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning -

Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?

A.

Cx program overview, project team members, and process activities

B.

Energy Use Breakdown, project team members, and Capital Improvements Measures

C.

Low and No Cost Improvements, Energy Use Breakdown, and Capital Improvements Measures

D.

Cx process activities, Water efficiency optimization strategies, and Energy Use Breakdown

Full Access
Question # 13

An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?

A.

Energy and Atmosphere Prerequisite, Building-Level Energy Metering

B.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices

Full Access
Question # 14

The intent of the Energy and Atmosphere Credit, Enhanced Refrigeration Management is to reduce ozone depletion and support early compliance with the

A.

Kyoto Protocol while minimizing direct contributions to climate change

B.

Montreal Protocol while minimizing direct contributions to climate change

C.

Kyoto Protocol while minimizing direct and indirect contributions to climate change

D.

Montreal Protocol while minimizing direct and indirect contributions to climate change

Full Access
Question # 15

What calculation is used to achieve Materials and Resources Credit, Purchasing - Ongoing?

A.

Cost of compliant furniture

B.

Weight of compliant furniture

C.

Cost of both compliant and non-compliant furniture

D.

Weight of compliant and non-compliant furniture

Full Access
Question # 16

Cooling tower blowdown is necessary because

A.

too much water in the system is inefficient so its water levels must be lowered

B.

a buildup of dissolved solids increases conductivity which decreases efficiency

C.

excess water treatment chemical levels corrode pipes and bleed-off reduces chemical levels

D.

cold temperatures can freeze pipes if water is not moved and bleed-off prevents that from happening

Full Access
Question # 17

Under what scenario must building visitors be surveyed for the Location and Transportation Credit, Alternative Transportation, Option 1?

A.

When the number of visitors reaches 10% the number of regular building occupants

B.

During the transportation survey period all visitors need to be invited to participate in the survey

C.

Every day no matter the number of visitors in relation to the number of regular building occupants

D.

When either the typical peak or daily average is greater than the number of regular building occupants

Full Access
Question # 18

A building is certified in LEED EB v2.0. Upon recertification, which LEED Operations and Maintenance version should be used?

A.

LEED EB v2.0

B.

Whichever version the team designates

C.

The version that is current at the time of registration for recertification

D.

The version subsequent to the version under which the project initially certified

Full Access
Question # 19

Which of the following strategies will qualify for an exemplary performance point under Innovation Credit, Innovation, Option 3. Additional Strategies?

A.

Meet at least 10% of total energy with on-site renewable energy

B.

Reduce outdoor water use by 60%

C.

Document an alternative transport

D.

Obtain a response rate for the occupant comfort survey of 100%

Full Access
Question # 20

Buildings account for what percentage of total energy use?

A.

30%

B.

40%

C.

50%

D.

60%

Full Access
Question # 21

An individual tenant in a multi-tenant building is unwilling or unable to provide their purchasing data. How does this affect the overall requirement for Materials and Resources Credit, Purchasing - Ongoing?

A.

The building is not eligible for this credit

B.

The total purchases would be decreased by the tenant's pro rata square footage

C.

The tenant's purchasing is assumed to be 50% compliant toward the sustainability criteria

D.

If the tenant's space is less than 10% of the total building, their total purchases can be excluded

Full Access
Question # 22

Which of the following options about project boundaries is correct?

A.

The LEED project boundary may not include other buildings

B.

A LEED campus boundary for the master site is not necessary to pursue with LEED campus certification

C.

The gross floor area of the LEED project should be no less than 2% of the gross land area within the LEED project boundary

D.

Sites with a master plan for multiple buildings and/or phased development must not designate a LEED project boundary for each individual project

Full Access
Question # 23

Which of the following is an environmentally friendly technology for controlling erosion?

A.

Mulching

B.

Laying asphalt

C.

Laying tarpaulin material

D.

Spraying water to contain dust

Full Access
Question # 24

Which refrigerant was phased out due to the Montreal Protocol?

A.

CFC-11

B.

HCFC-22

C.

HFC-134a

D.

HCFC-123

Full Access
Question # 25

What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

10% of the vacant space

B.

10% of the gross floor area

C.

10% of the project site area

D.

10% of the regularly occupied area

Full Access
Question # 26

What is the minimum percentage reduction from the baseline required to earn the exemplary performance point for the Indoor Water Use Reduction Credit, Option 2?

A.

20%

B.

25%

C.

30%

D.

35%

Full Access
Question # 27

What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Compile meter data into daily and weekly summaries

B.

Use Labs21 Energy Benchmarking tool to calculate minimum energy performance

C.

Establish an ENERGY STAR® Portfolio Manager profile

D.

Benchmark building site energy data of at least three similar buildings

Full Access
Question # 28

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Residential dishwashers and coffee makers

B.

Residential clothes washers and dishwashers

C.

Residential dishwashers and drinking fountains

D.

Residential clothes washers and vending machines

Full Access
Question # 29

When a building owner is deciding whether to execute an ASHRAE Level 2 audit or commissioning for Energy and Atmosphere Credit, Existing Building Commissioning -Analysis, which of the following statements most appropriately explains the difference between an ASHRAE Level 2 audit and commissioning of an existing building?

A.

An ASHRAE Level 2 audit is required for newer buildings while commissioning is required for buildings in operation for more than five years

B.

An ASHRAE Level 2 audit requires development of an energy use breakdown based on sub-metering while commissioning requires development of an energy use breakdown based on energy modeling

C.

An ASHRAE Level 2 audit involves testing the operation of the systems against the sequences of operation while commissioning involves determining that the system operation meets the owner's current facility requirements

D.

An ASHRAE Level 2 audit focuses on finding major upgrades to the building envelope or me-chanical, electrical, or controls systems while commissioning focuses on controls, proper sys-tem operations, and efficiency improvements

Full Access
Question # 30

What is the intent of Indoor Environmental Quality Credit, Daylight and Quality Views?

A.

To achieve a daylight factor in all spaces

B.

To provide lighting controls for regularly occupied spaces

C.

To achieve direct line of site to vision glazing for all building occupants

D.

To provide a connection between building occupants and the outdoor environment

Full Access
Question # 31

Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement

Plan?

A.

Soils

B.

Hydrology

C.

Vegetation

D.

Maintenance equipment

Full Access
Question # 32

The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is

A.

correlated to an increase of the floor area by at least 5%

B.

determined based upon flush-out procedure requirements

C.

determined by the project team as there is no minimum requirement

D.

correlated to alterations that include construction activity by more than one trade

Full Access
Question # 33

Which of the following is a feature of the ENERGY STAR® Portfolio Manager?

A.

Requires input of 36 months of data

B.

Requires ISO 14001 compliance

C.

Requires calculation and input of site energy usage

D.

Requires California Title 24 compliance

Full Access
Question # 34

Which of the following environmental concerns is exacerbated by impervious surfaces?

A.

Increase in light pollution

B.

Indoor Environmental Quality decreases

C.

Retention pond diminishment

D.

Contaminated runoff harming aquatic life

Full Access
Question # 35

An Indoor Environmental Quality policy for facility maintenance and renovation activities under Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy must follow the recommended

A.

procedures in Indoor Environmental Quality Green Cleaning Policy, In-house Green Cleaning Policy thermal comfort strategies in American Society of Heating Refrigerating and Air Conditioning Engineers

(ASHRAE) 55-2010

B.

direct exhaust airflow measurement strategy using devices capable of measuring the exhaust airflow meeting fresh air requirements

C.

control measures of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor

D.

Environmental Quality Guidelines for Occupied Buildings Under Construction

Full Access
Question # 36

The project team is attempting to achieve Option 1. Lighting Controls in Indoor EnvironmentalQuality Credit, Interior Lighting. Which of the following is required documentation?

A.

Table of lighting controls installed

B.

Manufacturers' data for occupancy sensors

C.

The total area of the building square footage

D.

A photometric chart of the multi-occupant space

Full Access
Question # 37

An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?

A.

120 days

B.

495 days

C.

Two years

D.

Three years

Full Access
Question # 38

The decision to replace Chlorofluorocarbon (CFC) and Hydrochlorofluorocarbon (HCFC) refrigerants with alternative refrigerants

A.

is straightforward because alternative refrigerants cost less to implement and operate more efficiently

B.

involves tradeoffs because alternative refrigerants are more difficult to manufacture, handle and process

C.

is straightforward because alternative refrigerants such as HFC-410A have a lower Global Warming Potential

(GWP)

D.

involves tradeoffs because alternative refrigerants may increase energy use and increase greenhouse gas emissions

Full Access
Question # 39

Who needs to be surveyed for an in-patient hospital project for Location and Transportation Credit, Alternative Transportation: Option 1. Transportation Survey?

A.

People visiting patients

B.

Hospital employees

C.

Patients being released

D.

Pharmaceutical representatives

Full Access
Question # 40

When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?

A.

Distribute the total number of surveys across all tenants evenly

B.

Distribute the total number of surveys across all tenants proportionately, according to their populations

C.

Distribute the total number of surveys across all tenants proportionately, according to their gross floor area

D.

Distribute the total number of surveys across all tenants proportionately, according to their regularly occupied Area

Full Access
Question # 41

Which of the following products qualifies under Materials and Resources Credit, Purchasing - Ongoing?

A.

A product labeled Sustainable Sourced

B.

An organic product produced within a 500 mi. (805 km) radius

C.

A United States Department of Agriculture (USDA) organic food product

D.

A Protected Harvest certified product purchased outside the performance period

Full Access
Question # 42

An organization pursuing LEED O+M certification for their headquarters has a renovation policy that includes strict requirements around the selection of building products and requires contractors working in the building to develop a plan for the diversion of waste produced during renovation projects. What must the organization add to their renovation policy to meet the requirements of Materials and Resources Prerequisite, Facility Maintenance and

Renovation Policy?

A.

Requirements around the selection of low-emitting materials for renovation projects

B.

Requirements for contractors to safeguard air quality during renovation

C.

Requirements for the salvage and reuse of furniture within the building

D.

Requirements for contractors to perform construction activity pollution prevention

Full Access
Question # 43

What is the maximum distance between readings required to represent the illumination levels at the property perimeter to earn the Sustainable Sites Credit, Light Pollution Reduction?

A.

50 ft. (15 m)

B.

80 ft. (24 m)

C.

100 ft. (30 m)

D.

200 ft. (60 m)

Full Access
Question # 44

Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite Indoor Water Use Reduction?

A.

Toilets, urinals, pre-rinse spray valves

B.

Toilets, private lavatory faucets, dishwashers

C.

Urinals, public lavatory faucets, kitchen sink faucets

D.

Urinals, showerheads, commercial kitchen pot filling faucets

Full Access
Question # 45

What public health risk must be balanced with water efficiency and chemical usage in every water treatment program?

A.

Botulism

B.

Mold growth

C.

Iron poisoning

D.

Legionella outbreak

Full Access
Question # 46

What credit or prerequisite requires a plan for a hazardous spill cleanup?

A.

Indoor Environmental Quality Prerequisite, Green Cleaning Policy

B.

Materials and Resources Credit, Solid Waste Management - Ongoing

C.

Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies

D.

Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program

Full Access
Question # 47

Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources

Credit, Solid Waste Management - Ongoing?

A.

Office chairs

B.

Mercury-containing lamps

C.

Shelving units

D.

Toner cartridges

Full Access
Question # 48

To determine possible credit compliance for Energy and Atmosphere Credit, Advanced Energy Metering, what information needs to be verified?

A.

That the meter data is remotely accessible

B.

That the meter is capable of storing data for at least 12 months

C.

That the meter(s) can be manually read

D.

That the meter(s) record data at a minimum of 15 minute intervals

Full Access
Question # 49

When developing a transportation survey, a LEED AP must make certain that the survey instrument collects information

A.

in a consistent manner from all respondents

B.

from the morning and evening commute only

C.

from non-consecutive days over a calendar month

D.

on every mode of transportation in a multi-mode daily commute

Full Access