Who is the best person to serve as the Indoor Environmental Quality Manager to successfully implement Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program?
What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?
Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\
What requirement must be met when creating a demand response program that satisfies Energy and
Atmosphere Credit, Demand Response?
Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?
When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?
If a manufacturer does not specify the calibration interval for the utility meters used for benchmarking building energy performance, the assessment team may specify a reasonable calibration interval not to exceed
Which of the following LEED AP Operations and Maintenance Water Efficiency Credits has exemplary performance?
A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be
submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning -
Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?
An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?
The intent of the Energy and Atmosphere Credit, Enhanced Refrigeration Management is to reduce ozone depletion and support early compliance with the
What calculation is used to achieve Materials and Resources Credit, Purchasing - Ongoing?
Under what scenario must building visitors be surveyed for the Location and Transportation Credit, Alternative Transportation, Option 1?
A building is certified in LEED EB v2.0. Upon recertification, which LEED Operations and Maintenance version should be used?
Which of the following strategies will qualify for an exemplary performance point under Innovation Credit, Innovation, Option 3. Additional Strategies?
An individual tenant in a multi-tenant building is unwilling or unable to provide their purchasing data. How does this affect the overall requirement for Materials and Resources Credit, Purchasing - Ongoing?
Which of the following is an environmentally friendly technology for controlling erosion?
What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
What is the minimum percentage reduction from the baseline required to earn the exemplary performance point for the Indoor Water Use Reduction Credit, Option 2?
What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
When a building owner is deciding whether to execute an ASHRAE Level 2 audit or commissioning for Energy and Atmosphere Credit, Existing Building Commissioning -Analysis, which of the following statements most appropriately explains the difference between an ASHRAE Level 2 audit and commissioning of an existing building?
What is the intent of Indoor Environmental Quality Credit, Daylight and Quality Views?
Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement
Plan?
The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is
Which of the following is a feature of the ENERGY STAR® Portfolio Manager?
Which of the following environmental concerns is exacerbated by impervious surfaces?
An Indoor Environmental Quality policy for facility maintenance and renovation activities under Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy must follow the recommended
The project team is attempting to achieve Option 1. Lighting Controls in Indoor EnvironmentalQuality Credit, Interior Lighting. Which of the following is required documentation?
An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?
The decision to replace Chlorofluorocarbon (CFC) and Hydrochlorofluorocarbon (HCFC) refrigerants with alternative refrigerants
Who needs to be surveyed for an in-patient hospital project for Location and Transportation Credit, Alternative Transportation: Option 1. Transportation Survey?
When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?
Which of the following products qualifies under Materials and Resources Credit, Purchasing - Ongoing?
An organization pursuing LEED O+M certification for their headquarters has a renovation policy that includes strict requirements around the selection of building products and requires contractors working in the building to develop a plan for the diversion of waste produced during renovation projects. What must the organization add to their renovation policy to meet the requirements of Materials and Resources Prerequisite, Facility Maintenance and
Renovation Policy?
What is the maximum distance between readings required to represent the illumination levels at the property perimeter to earn the Sustainable Sites Credit, Light Pollution Reduction?
Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite Indoor Water Use Reduction?
What public health risk must be balanced with water efficiency and chemical usage in every water treatment program?
What credit or prerequisite requires a plan for a hazardous spill cleanup?
Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources
Credit, Solid Waste Management - Ongoing?
To determine possible credit compliance for Energy and Atmosphere Credit, Advanced Energy Metering, what information needs to be verified?
When developing a transportation survey, a LEED AP must make certain that the survey instrument collects information