To comply with Materials and Resources Prerequisite: Certified Tropical Wood, all wood in the building must be:
Non-tropical, reused, reclaimed, or certified
Tropical wood that is more than 10 years old
Only from the tropical region
From within 200 miles of the building site
TheLEED for Homes Rating System (v4)includes theMaterials and Resources (MR) Prerequisite: Certified Tropical Wood, which ensures that wood used in LEED projects is sourced sustainably to protect tropical ecosystems.
According to theLEED Reference Guide for Homes Design and Construction (v4):
MR Prerequisite: Certified Tropical Wood
All new wood in the project must be nontropical, reused, reclaimed, or certified by the Forest Stewardship Council (FSC). Tropical wood, if used, must be FSC-certified. This prerequisite ensures that wood sourcing does not contribute to deforestation in ecologically sensitive regions.
Source: LEED Reference Guide for Homes Design and Construction, v4, Materials and Resources Prerequisite: Certified Tropical Wood, p. 156.
TheLEED v4.1 Residential BD+Crating system confirms:
MR Prerequisite: Certified Tropical Wood
All wood must be nontropical, reused, reclaimed, or FSC-certified. Tropical wood is only permitted if it is FSC-certified.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
To comply, all wood must benon-tropical, reused, reclaimed, or certified(Option A), ensuring sustainable sourcing across all wood types used in the project.
Why not the other options?
Which of the following written materials must be provided to a new home occupant to comply with Energy and Atmosphere Prerequisite, Education of the Homeowner, Tenant or Building Manager?
ASHRAE Standard 90.1-2006
Operations and maintenance manual
1990 Americans with Disabilities Act (ADA) guidelines
Environmental Protection Agency (EPA) for Homes guidelines
The question references an "Energy and Atmosphere Prerequisite" for education, which appears to be a misnomer, as theLEED for Homes Rating System (v4)includes this requirement under theInnovation (IN) Prerequisite: Education of the Homeowner, Tenant, or Building Manager. This prerequisite ensures occupants receive materials to understand and maintain the home’s sustainable features.
According to theLEED Reference Guide for Homes Design and Construction (v4):
IN Prerequisite: Education of the Homeowner, Tenant, or Building Manager
Provide an operations and maintenance manual to the homeowner or tenant, including product manuals for installed equipment (e.g., HVAC, water heating systems) and information on the operation and maintenance of green features.
Source: LEED Reference Guide for Homes Design and Construction, v4, Innovation Prerequisite: Education of the Homeowner, Tenant, or Building Manager, p. 188.
TheLEED v4.1 Residential BD+Crating system confirms:
IN Prerequisite: Education of the Homeowner or Tenant
An operations and maintenance manual must be provided to occupants, detailing the function, operation, and maintenance of sustainable systems and equipment in the home.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
The correct answer isoperations and maintenance manual(Option B), as this is the required written material to comply with the prerequisite.
Why not the other options?
Which of the following power needs requires special consideration at the design phase?
Continuously operating bathroom fans
220-volt supply to laundry room
ENERGY STAR appliances
Electric vehicle charging station
TheLEED for Homes Rating System (v4)encourages planning for energy-efficient and sustainable technologies during the design phase, particularly for significant electrical loads that impact infrastructure, as addressed in credits likeEnergy and Atmosphere (EA) Credit: Optimize Energy Performance.
According to theLEED Reference Guide for Homes Design and Construction (v4):
EA Credit: Optimize Energy Performance
Design the home to accommodate high-efficiency systems and emerging technologies, such as electric vehicle (EV) charging stations, which require dedicated electrical capacity (e.g., 240-volt circuits) and planning during the design phase to ensure adequate panel capacity and conduit placement.
Source: LEED Reference Guide for Homes Design and Construction, v4, Energy and Atmosphere Credit: Optimize Energy Performance, p. 118.
TheLEED v4.1 Residential BD+Crating system confirms:
EA Credit: Optimize Energy Performance
Electric vehicle charging stations require special consideration in the design phase, including dedicated circuits and infrastructure to support high-voltage, high-amperage loads, ensuring future scalability and energy efficiency.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
Anelectric vehicle charging station(Option D) requires special consideration during the design phase due to its high power demand (typically 240 volts, 30–50 amps), necessitating dedicated circuits, panel capacity upgrades, and potential conduit or wiring planning to avoid costly retrofits.
Why not the other options?
The prerequisite for homeowner basic operations and training must include:
Educational information on “green powerâ€
A map of neighborhood open spaces
A two-hour house walk-through including equipment training
A DVD with operations and maintenance information
TheLEED for Homes Rating System (v4)includes theInnovation (IN) Prerequisite: Education of the Homeowner, Tenant, or Building Manager, which ensures occupants are educated on the home’s sustainable features and maintenance requirements.
According to theLEED Reference Guide for Homes Design and Construction (v4):
IN Prerequisite: Education of the Homeowner, Tenant, or Building Manager
Provide a minimum of a two-hour walk-through of the home with the homeowner or tenant, including training on the operation and maintenance of equipment and systems, such as HVAC, water heating, and renewable energy systems.
Source: LEED Reference Guide for Homes Design and Construction, v4, Innovation Prerequisite: Education of the Homeowner, Tenant, or Building Manager, p. 188.
TheLEED v4.1 Residential BD+Crating system confirms:
IN Prerequisite: Education of the Homeowner or Tenant
A two-hour walk-through with equipment training is required to educate homeowners on the operation and maintenance of green features.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
The prerequisite requiresa two-hour house walk-through including equipment training(Option C) to ensure homeowners understand how to operate and maintain the home’s sustainable systems.
Why not the other options?
What is the advantage of using native and adapted plant species instead of conventional turf?
Increased stormwater runoff
Decreased wildlife habitat
Decreased frequency of mowing
Increased use of potable water
TheLEED for Homes Rating System (v4)promotes the use of native and adapted plants in theWater Efficiency (WE) Credit: Outdoor Water UseandSustainable Sites (SS) Credit: Site Development – Protect or Restore Habitatto reduce maintenance and environmental impacts compared to conventional turf.
According to theLEED Reference Guide for Homes Design and Construction (v4):
WE Credit: Outdoor Water Use (1–4 points)
Native and adapted plant species require less maintenance, including decreased frequency of mowing, compared to conventional turf grass, which often needs frequent cutting to maintain appearance.
Source: LEED Reference Guide for Homes Design and Construction, v4, Water Efficiency Credit: Outdoor Water Use, p. 98.
TheLEED v4.1 Residential BD+Crating system confirms:
WE Credit: Outdoor Water Use
Using native and adapted plants reduces maintenance demands, such as mowing frequency, compared to turf grass, while also lowering irrigation needs.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
The correct answer isdecreased frequency of mowing(Option C), as native and adapted plants typically require less frequent maintenance than turf grass.
Why not the other options?
A proposed 1000 kWh photovoltaic system will achieve two points in the Energy and Atmosphere, Renewable Energy credit. If the client chooses a 2000 kWh system instead, how many points will be achieved?
One point
Two points
Three points
Four points
TheLEED for Homes Rating System (v4)includes theEnergy and Atmosphere (EA) Credit: Renewable Energy, which awards points based on the percentage of annual energy use offset by on-site renewable energy systems, such as photovoltaic (PV) systems.
According to theLEED Reference Guide for Homes Design and Construction (v4):
EA Credit: Renewable Energy (1–4 points)
Install on-site renewable energy systems to offset a percentage of the home’s annual energy use. Points are awarded as follows:
1 point: 0.5 kW or 5% of annual energy use.
2 points: 1.0 kW or 10% of annual energy use.
3 points: 1.5 kW or 15% of annual energy use.
4 points: 2.0 kW or 20% of annual energy use.The kW values are for photovoltaic systems and assume typical production rates (e.g., 1 kW ≈ 1,500 kWh/year).Source: LEED Reference Guide for Homes Design and Construction, v4, Energy and Atmosphere Credit: Renewable Energy, p. 138.
TheLEED v4.1 Residential BD+Crating system confirms:
EA Credit: Renewable Energy
Points are awarded based on the installed capacity of PV systems (e.g., 2.0 kW for 4 points) or the percentage of energy offset, whichever is higher. A 2000 kWh system (approximately 2.0 kW) qualifies for 4 points.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
The question states a 1000 kWh PV system earns 2 points, corresponding to approximately 1.0 kW (assuming 1 kW ≈ 1,500 kWh/year). A 2000 kWh system is approximately 2.0 kW (2000 ÷ 1500 ≈ 1.33 kW, but conservatively aligned with the 2.0 kW threshold in LEED), which earns4 points(Option D).
Why not the other options?
A. One point: This corresponds to 0.5 kW, far below a 2000 kWh system.
B. Two points: This is the baseline for a 1000 kWh (1.0 kW) system, not 2000 kWh.
How could a LEED AP assist a home builder in evaluating a site for a new LEED for Homes single-family residence?
Calculate the acreage of public parking adjacent to the proposed site
Evaluate the site for any past development activity
Evaluate the potential for site pollution from adjoining properties
Determine if the location is in the city limits
TheLEED for Homes Rating System (v4)emphasizes site evaluation for credits likeLocation and Transportation (LT) Credit: Site Selection, which includes assessing past development activity to determine eligibility for options such as infill development or avoiding sensitive land.
According to theLEED Reference Guide for Homes Design and Construction (v4):
LT Credit: Site Selection (1–3 points)
Evaluate the site to determine if it meets criteria for infill development (e.g., at least 75% of the perimeter borders previously disturbed land) or avoids environmentally sensitive areas (e.g., prime farmland, floodplains). A LEED AP can assist by assessing past development activity to confirm eligibility for credits like Option 2: Infill Development.
Source: LEED Reference Guide for Homes Design and Construction, v4, Location and Transportation Credit: Site Selection, p. 54.
TheLEED v4.1 Residential BD+Crating system confirms:
LT Credit: Site Selection
A key step in site evaluation is determining whether the site has been previously developed or disturbed, which supports credits for infill or brownfield redevelopment.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
The correct answer isevaluate the site for any past development activity(Option B), as this directly supports achievingLT Credit: Site Selectionby confirming eligibility for infill development or other site-related credits.
Why not the other options?
A project team for a home in a small town is pursuing LEED certification. The home is designed with the following site characteristics:
• The lot is square.
• Three sides of the square lot border undeveloped land.
• The previous home covering 78% of the lot is deconstructed and the new LEED home will be built in its place.
• One full side of the square lot borders a home that was built 10 years before the LEED project.
Compliance with which of the following options, if any, will qualify the home for Location and Transportation Credit, Site Selection?
Infill only
Previously Developed only
Infill and Previously Developed
None, this home does not comply with Location and Transportation Credit, Site Selection
TheLEED for Homes Rating System (v4)includes theLocation and Transportation (LT) Credit: Site Selection, which awards points for building on infill or previously developed sites to minimize environmental impact.
According to theLEED Reference Guide for Homes Design and Construction (v4):
LT Credit: Site Selection (1–3 points)
Option 1: Infill: At least 75% of the lot’s perimeter must border previously developed parcels (e.g., existing buildings or infrastructure).
Option 2: Previously Developed: The lot must have been previously altered by construction (e.g., a prior home covering a significant portion of the site) before the LEED project.A site with a previous home covering 78% of the lot qualifies as previously developed, but if only one side (25% of a square lot’s perimeter) borders a developed parcel, it does not meet the infill requirement.Source: LEED Reference Guide for Homes Design and Construction, v4, Location and Transportation Credit: Site Selection, p. 54.
TheLEED v4.1 Residential BD+Crating system confirms:
LT Credit: Site Selection
A site qualifies forOption 2: Previously Developedif it was previously altered (e.g., a home covering 78% of the lot). Infill requires 75% of the perimeter to border developed land, which a square lot with only one developed side (25%) does not meet.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
Evaluation:
Infill: The lot is square, with one side (25% of the perimeter) bordering a developed home. This does not meet the 75% perimeter requirement for infill.
Previously Developed: The previous home covered 78% of the lot, qualifying it as previously developed.
The correct answer isPreviously Developed only(Option B), as the site meets the criteria for Option 2 but not Option 1.
Why not the other options?
A. Infill only: The site does not meet the 75% perimeter requirement for infill (only 25% borders developed land).
C. Infill and Previously Developed: The site does not qualify for infill, so it cannot meet both options.