Searching for workable clues to ace the CIPS L6M5 Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s L6M5 PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 4

Cyril Engineering entered into a contract with Dojo Ltd for electrical engineering services to a power station.

    The contract was successful for two years, but Cyril Engineering failed to fulfill obligations recently.

Q: What is this situation known as?

Answer Options:

A.

Consequential Loss

B.

Damages

C.

Default

D.

Direct Loss

Full Access
Question # 5

Paradigm Digital Services has strict office rules on branding, workspaces, and dress code.

Q: Which aspect of the Cultural Web does this describe?

Answer Options:

A.

Organizational structure

B.

Symbols

C.

Control systems

D.

Rituals

E.

Power structure

Full Access
Question # 6

Which elements define an organization's culture? (Select all that apply.)

✔ Beliefs and assumptions

✔ Ways of interacting

✔ The physical environment

✔ Attitudes and customs

Full Access
Question # 7

Foxglove Ltd has a rigid hierarchy, standardized work, and strict procedures. Employees know their roles and work quality is high.

Q: What type of culture does Foxglove Ltd have?

Answer Options:

A.

Task

B.

Role

C.

Power

D.

Person

Full Access
Question # 8

Skipped

Which of the following describes tacit knowledge? Select all that apply.

A.

It can be found in Standard Operating Procedures within the procurement department

B.

It is easy to capture and write down

C.

It can be captured from reports and data

D.

It is easy to transfer from one person to another

E.

It is usually unwritten