Pre-Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

HPE7-A03 Exam Dumps - HPE Aruba Networking Certified Network Architect - Campus Access

Question # 4

ACME retail has 38 locations spread out across Ave US states and two provinces in Canada. They are looking to grow 20% over the next two years. They have an HO with a staff of 200 employees. The organization has eight Regional Managers and two VPs who work from home and the road. Stores typically have 17 employees on average per location.

The two warehouses have a remote loading system and 20 employees each to load the trucks and fulfill the online orders. The warehouse has 40-foot ceilings and large metal racks to store inventory. The main location is 240K sq ft (22300 st) m) and the Canadian warehouse Is 130K sq ft (12100 sq ml. The forkllfts on the loading docks are equipped with a wireless tablet on board.

A typical store Is reportedly about 60.000 sq ft (5575 sqm) and smaller stores are planned at 25.000 sq ft '2320 sq mi. The locations need to expand the abilities to vendors that need to add setup displays or Interactive kiosks in the stores. The current Infrastructure was installed In 2015 and used wireless N technology in a coverage model. The wiring is CatS. and they are unsure of the fiber connections. The inventory is all placed on the floor when it is delivered to the local store.

Inventory control is handled through Zebra barcode scanners, and they have had a lot of issues in getting signals throughout the stores and this makes monthly inventory difficult. The organization has a small help desk to troubleshoot issues that happen at the retail locations and PC support for the office. The company is looking to upgrade away from the current pbx system later this year. With the need to grow and cut costs, they are interested in moving the data to the cloud but need to get almost real-time inventory control for the online service to function.

The network has all been wired over the last ten years, but with the new systems being all wireless, they have seen the trend to offer wireless to all the vendors for their needs but also would like to allow employees, guests, and contractors all to use it. With the new IT director starting next week, the project has been set by the CTO of the company. The marketing group has asked how they can interact with the customers and get more info, while the IT support desk needs to cut staff in halt.

The. office has an MDF and two IDFs located on floors one and two. The HOF is in the basement, and you have multiple WAN circuits for the HO links. Each store has a local handoff from the cable company (ethernet) In the middle of the store in the office, so distance for the wiring is not an issue.

The customer has budget concerns but does want something that could last 7+ years.

Based on the scenario, where would you look to add additional items to the BOM to aid the company goals'(Select three.)

A.

Building Facilities

B.

Sales Management

C.

Customer Experience Officer

D.

Security Team/CISO

E.

Marketing

F.

Finance Team

Full Access
Question # 5

Which is true when it comes to Aruba Central licensing for gateways? (Select two.)

A.

Aruba Gateway normallicensing is subdivided into three categories: Foundation. Advanced, and Foundation Base.

B.

SD-WAN Gateway functionality requires security licensing.

C.

Aruba SD-8ranch Gateway licenses allow normal WLAN Gateway features within a campus.

D.

Aruba WLAN Gateway licenses allow normal SD-Branch features within a campus.

Full Access
Question # 6

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client has decided to market additional tools to its retail customers. The desire is to make a Blue Dot wayfinding. app available to any customer to allow them to locate stores and services within the retail space. They would also like to have directed pop-ups within the app appear when a customer walks within close proximity to any of the 10 "Promotional Kiosks"

What licensing will be needed to make this retail solution a reality? (Select two.)

A.

qty 1 Meridian Map subscription

B.

qty Z Meridian Blue Dot subscriptions

C.

qty 2 Meridian Map subscriptions

D.

qty 10 Aruba beacons

Full Access
Question # 7

ACME retail has 38 locations spread out across Ave US states and two provinces in Canada. They are looking to grow 20% over the next two years. They have an HO with a staff of 200 employees. The organization has eight Regional Managers and two VPs who work from home and the road. Stores typically have 17 employees on average per location.

The two warehouses have a remote loading system and 20 employees each to load the trucks and fulfill the online orders. The warehouse has 40-foot ceilings and large metal racks to store inventory. The main location is 240K sq ft (22300 st) m) and the Canadian warehouse Is 130K sq ft (12100 sq ml. The forkllfts on the loading docks are equipped with a wireless tablet on board.

A typical store Is reportedly about 60.000 sq ft (5575 sqm) and smaller stores are planned at 25.000 sq ft '2320 sq mi. The locations need to expand the abilities to vendors that need to add setup displays or Interactive kiosks in the stores. The current Infrastructure was installed In 2015 and used wireless N technology in a coverage model. The wiring is CatS. and they are unsure of the fiber connections. The inventory is all placed on the floor when it is delivered to the local store.

Inventory control is handled through Zebra barcode scanners, and they have had a lot of issues in getting signals throughout the stores and this makes monthly inventory difficult. The organization has a small help desk to troubleshoot issues that happen at the retail locations and PC support for the office. The company is looking to upgrade away from the current pbx system later this year. With the need to grow and cut costs, they are interested in moving the data to the cloud but need to get almost real-time inventory control for the online service to function.

The network has all been wired over the last ten years, but with the new systems being all wireless, they have seen the trend to offer wireless to all the vendors for their needs but also would like to allow employees, guests, and contractors all to use it. With the new IT director starting next week, the project has been set by the CTO of the company. The marketing group has asked how they can interact with the customers and get more info, while the IT support desk needs to cut staff in halt.

The. office has an MDF and two IDFs located on floors one and two. The HOF is in the basement, and you have multiple WAN circuits for the HO links. Each store has a local handoff from the cable company (ethernet) In the middle of the store in the office, so distance for the wiring is not an issue.

The customer has budget concerns but does want something that could last 7+ years.

Which two projects does the customer have in the planning state? (Select two)

A.

VoIP upgrade

B.

Inventory Control System

C.

kiosks/display station

D.

new POS system

Full Access
Question # 8

What is the difference between 0M4 and 0M5 cabling? (Select two)

A.

0M4 supports distances up to 100 m. while 0M5 supports distances up to 150 m using 100 GBps transceivers.

B.

0M5 supports Multiplexing operating in the 850 to 950 nm range, while 0M4 does not

C.

0M5 is approved as wide Band Multimode Fiber (WBMMF). while 0M4 Is not.

D.

0M5 supports speeds up to 100 Gbps. while OM4 does not.

Full Access
Question # 9

You hired a junior engineer to assist you with a large-scale network infrastructure project. The engineer has never worked on such a complex project 'ants to better understand the role that each role that each stakeholder will play in the project.

March the stakeholder title to the responsibilities that would most likely apply to their role.

Full Access
Question # 10

A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guests

Each ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.

The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).

For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.

The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.

The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.

The week after the presentation of your design to the CIO of the cruise line company, the CIO calls you to discuss increasing trie security of the wired network Infrastructure. Since one of their competitors had one of their cruise ships cyber hacked, the CSO of the cruise line has mandated increased security on the wired network. They nave heard about dynamic segmentation and central and decentral overlay networks.

What would you advise as the most cost-efficient solution?

A.

Standardize on Aruba 6000 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

B.

Standardize on Aruba 6100 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

C.

Standardize on Aruba 6300 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

D.

Standardize on Aruba 6200 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

Full Access
Question # 11

it has been identified that the client's existing network is having to retransmit packets due to possible hardware or configuration issues. A review of hardware configuration and transport reliability will need to be assessed prior to completing the new design.

What should this phenomenon be classified as?

A)

B)

C)

A.

OptionA

B.

OptionB

C.

OptionC

Full Access
Question # 12

A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guests

Each ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.

The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).

For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.

The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.

The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.

Based on the best practices, what should you recommend as the correct optic type for the connection between the IDF and the cabins?

A.

Aruba 106 SFP- LC LRM 220 m MMF Transceiver

B.

Aruba 10GBASE-T SFP- RJ--35 30 m Cat6A Transceiver

C.

Aruba 106 SFP- LC SR 300 m MMF Transceiver

D.

Aruba 10G LC BiDi 40 km-D 1330/1270 XCVR

Full Access
Question # 13

The clients existing network isexperiencing trouble with voice occasionally dropping out on phone calls between office locations, it Is determined that no packet loss is occurring and QOS is likely the cause. With what phenomenon Is the client currently experiencing issues?

A)

B)

C)

A.

Option A

B.

Option B

C.

Option C

Full Access
Question # 14

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client would take to ensure redundant RADIUS resources in each of their three geographical regions (AMER. EMEA. and APAC) A large office location Is available In each region with sufficient VMware resources available.

- Each region has 5.000 clients, all of which will need to do either 802.1 x wired or wireless authentications as well as 802.1 x authentication for a single personal device on Wi-Fi.

• All of the non-personal devices will also need to validate health with a local agent.

• A total of 500 guests are expected to be connected on average with a maximum of 700 simultaneous connections making use of Guest Portal for access to the Internet.

• TACACS authentication will also be configured for a total of 1,200 evenly dispersed NADs.

In order to support virtual IPs and server redundancy in each region how many Virtual Policy Manager Licenses will be needed?

A.

six licenses. C3000V

B.

six licenses. C2000V

C.

three licenses. C3000V

D.

three licenses. C2000V

Full Access
Question # 15

You are responding to the customer's RFP and are at the point of documenting design decisions that were not specified in the RFP or the RFP questions. What are valid examples of assumptions made that should be presented to the customer during the response? (Select three >

A.

The customer has technical staff that is capable of implementing the proposed equipment.

B.

Optional monitoring systems (syslog, How collectors) exist.

C.

Vendor equipment availability will meet customer project timelines.

D.

Sufficient space and power exist to rack and turn up the proposed equipment.

E.

Adequate virtual machine resources exist to successfully install required or optional management systems.

F.

The customer budget Is sufficient to afford the proposed solution.

Full Access
Question # 16

identify the stakeholders when gathering information for the network design and new IDF/MDF design. (Select two.)

A.

Help desk manager

B.

Facility manager

C.

Chief Financial Officer

D.

Network Operations manager

Full Access
Question # 17

'Don't Buy at Us' is a US-based retail company that is expanding Into Europe. They are expanding into EMEA with a regional headquarters called HQ2 inside The Netherlands.

Their US-based headquarters HQ1 was refreshed last year based on the Aruba ESP architecture. You have treated the design for HQ? based on the same design as HQ1. a two-tier architecture. The high level is shown below.

Switch BOM for this project based on Two Tier:

Collapsed Core: 2 x Aruba 8360-16Y2C in VSX (ISL 2» ICOG0E DAC)

Access Slack: 10 x Slack of Aruba 6200F 48G Class4 PoE 4SFP- 740W each stack has A members. VSF

with 10GbE VSF links) 12 x 10GbE uplink pet stack)

During the presentation of your design to the CTO of 'Don't Buy at Us' you were informed about the updated fiber infrastructure thatDon't Buy at Us' has installed in HQ2.

The core stack is Installed in the MDF and per IOF there is one access stack installed. Based on best practice, what is the most cost-effective update to the switch BOM?

A)

B)

C)

D)

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 18

Which alternative source is best suited for site surveys or simul-ations if no floor plans are available?

A.

blank sheet of paper

B.

Google Maps

C.

simple wall drawings

D.

tire escape plan

Full Access
Question # 19

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client would like 10 include Blue Dot wayfinding for their carpeted office space. The retail floors are not currently in scope

What would be needed to ensure proper licensing of the solution?

A.

Qty 4 Meridian Blue Dot subscriptions

B.

Qtyl Meridian Tracking subscription

Qty 1 Meridian Blue Dot subscription

C.

Qty 4 Meridian Map subscriptions

Qty 4 Meridian Blue Dot subscriptions

D.

Qty 1 Meridian Blue Dot subscription

Full Access
Question # 20

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client would like 10 include Blue Dot location tracking in their four floors of corporate space. The APs are not Ideally placed to allow for smooth map transitions.

What could you add lo provide better tracking? (Select two.)

A.

UXI sensors

B.

beacons

C.

more APs

D.

tags

Full Access
Question # 21

ACME retail has 38 locations spread out across Ave US states and two provinces in Canada. They are looking to grow 20% over the next two years. They have an HO with a staff of 200 employees. The organization has eight Regional Managers and two VPs who work from home and the road. Stores typically have 17 employees on average per location.

The two warehouses have a remote loading system and 20 employees each to load the trucks and fulfill the online orders. The warehouse has 40-foot ceilings and large metal racks to store inventory. The main location is 240K sq ft (22300 st) m) and the Canadian warehouse Is 130K sq ft (12100 sq ml. The forkllfts on the loading docks are equipped with a wireless tablet on board.

A typical store Is reportedly about 60.000 sq ft (5575 sqm) and smaller stores are planned at 25.000 sq ft '2320 sq mi. The locations need to expand the abilities to vendors that need to add setup displays or Interactive kiosks in the stores. The current Infrastructure was installed In 2015 and used wireless N technology in a coverage model. The wiring is CatS. and they are unsure of the fiber connections. The inventory is all placed on the floor when it is delivered to the local store.

Inventory control is handled through Zebra barcode scanners, and they have had a lot of issues in getting signals throughout the stores and this makes monthly inventory difficult. The organization has a small help desk to troubleshoot issues that happen at the retail locations and PC support for the office. The company is looking to upgrade away from the current pbx system later this year. With the need to grow and cut costs, they are interested in moving the data to the cloud but need to get almost real-time inventory control for the online service to function.

The network has all been wired over the last ten years, but with the new systems being all wireless, they have seen the trend to offer wireless to all the vendors for their needs but also would like to allow employees, guests, and contractors all to use it. With the new IT director starting next week, the project has been set by the CTO of the company. The marketing group has asked how they can interact with the customers and get more info, while the IT support desk needs to cut staff in halt.

The. office has an MDF and two IDFs located on floors one and two. The HOF is in the basement, and you have multiple WAN circuits for the HO links. Each store has a local handoff from the cable company (ethernet) In the middle of the store in the office, so distance for the wiring is not an issue.

The customer has budget concerns but does want something that could last 7+ years.

What are two primary concerns of the Stakeholder' (Select two.)

A.

cost of solution

B.

future proof

C.

ease of access

D.

expansion

Full Access