universal container UC want to track the asset lifecycle when equipment has
been snapped out
What should a consultant recommend to meet this requirement?
Universal Containers's Technicians may be assigned to Jobs with an arrival window to meet the customer appointment time preference.Technicians are also assigned to Jobs without a preferred appointment time.
In which two ways should the Consultant define Operating Hours to meet this requirement?
Choose 2 answers
Universal Containers wants to track Technicians' van stock using the Salesforce Field Service mobile app a ensure that Technicians report when parts are used.
Which three data elements should a Consultant recommend tracking to support these requirements?
Choose 3 answers
Universal Containers operates in a highly regulated industry. Technicians must conduct quarterly inspections for all customers in their region. Each inspection
should be completed within a single visitand include all installed assets on site.
Which two Maintenance Plan settings should the
Consultant recommend? Choose ? answers
A consultant has implemented user territories at Northern Trail Outfitters (NTO) in a private sharing model. A new Midwest Service Territory has been created.
Which two actions should NTO take to givethe dispatcher access to all relevant Midwest records? Choose 2 answers
Northern Trail Outfitters (NTO) wants to use crews to service its customers. NTO's consultant recommends using the Crew Management tool to create and maintain the crews, and indicates that access to the tool is given via a permission set.
Which two permission sets should give a user access to the Crew Management tool?
Choose ? answers
When completing a Work Order in the field, the Technician needs to capture two signatures to ensure compliance.
Which steps are needed to configure the signature capture?
Which two considerations impact the scheduled timeframe of Multi-day Work?
Choose 2? answers