Cyber Monday Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

D-VXR-DY-23 Exam Dumps - Dell VxRail Deploy 2023

Searching for workable clues to ace the EMC D-VXR-DY-23 Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s D-VXR-DY-23 PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 9

A VxRail Test Plan has been completed What is the protocol for recording the results'?

A.

With the implementation team, complete and document each test, test date, and a screenshot of results

B.

In front of a customer, complete each test and document the test date

C.

With the implementation team, complete each test and document the test date

D.

In front of a customer, complete and document each test, test date, and a screenshot of results

Full Access
Question # 10

An implementation engineer is performing a precheck on a VxRail cluster before expansion. During validation, they find out that the host is not compatible.

Use the VxRail simulator to describe why the host is Incompatible.

Note: It is necessary to close (x) the simulator window before you can select a response to this question.

A.

bmc and bios are running older versions

B.

Insufficient number of vSphere licenses

C.

Firmware of ESXi host needs to be updated

D.

Invalid vCenter 5erver license

Full Access
Question # 11

An implementation engineer is configuring the network firewall to support a VxRail installation. Where can they find the necessary firewall rules?

A.

Network Validation Tool

B.

VxRail Configuration Portal

C.

As-Built Configuration Report

D.

Rack worksheet of the Network PEQ

Full Access
Question # 12

What is a valid 2-node VxRail cluster configuration?

A.

2x 10 GbE and 2x 25 GbE in a switch configuration and external vCenter

B.

2x 1 GbE and 2x 10 GbE in a direct-connect configuration and external vCenter

C.

2x 1 GbE and 2x 10 GbE in a switch configuration and internal vCenter

D.

2x 10 GbE and 2x 25 GbE in a direct-connect configuration and internal vCenter

Full Access
Question # 13

An implementation engineer needs to validate the VxRail network configuration. Where can they obtain the NVT for VxRail?

A.

Dell Technologies Central

B.

Dell Technologies Information Hub

C.

Dell VxRail Expert Channel

D.

Dell VxRail Fast Pass

Full Access
Question # 14

What is the minimum number of VxRail nodes required for a vSAN storage policy with RAID-5 (Erasure Coding)?

A.

3

B.

4

C.

5

D.

6

Full Access
Question # 15

Where can an administrator find steps to perform a manual verification of the customer network?

A.

Customer Simplified Form

B.

Dell EMC VxRail Network Planning Guide

C.

Pre-Engagement Questionnaire (PEQ)

D.

Dell Technologies SolVe Online

Full Access
Question # 16

A planned VxRail Stretched Cluster will have four hybrid nodes at each site. What is the recommended storage policy to ensure cross-site and local protection, using storage as efficiently as possible?

A.

Site disaster tolerance – None keep data on Preferred (stretched cluster)

Failures to tolerate – 1 failure – RAID-1 (Mirroring)

B.

Site disaster tolerance – Dual site mirroring (stretched cluster)

Failures to tolerate – 1 failure – RAID-5 (Erasure Coding)

C.

Site disaster tolerance – Dual site mirroring (stretched cluster)

Failures to tolerate – No data redundancy

D.

Site disaster tolerance – Dual site mirroring (stretched cluster)

Failures to tolerate – 1 failure – RAID-1 (Mirroring)

Full Access
Go to page: