Question # 4

What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question.

A.

Reduced production times

B.

Reduced delivery times

C.

Option to use make-to-order production

D.

Option to forecast planning for production resources

Full Access
Question # 5

How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 Correct answers to this question.

A.

Increase the capacity supply in a time-phased interval.

B.

Determine a time period with available capacity on the planning board.

C.

Execute an infinite production planning run for the critical resources.

D.

Reduce the planning Window.

E.

Form optimum sequence to reduce setup times.

Full Access
Question # 6

In the Capacity Scheduling Table, which settings can you select for the planning strategy?

Note: There are 3 correct answers to this question.

A.

Finiteness level

B.

Fixed pegging

C.

Scheduling control

D.

Planning mode

E.

Direction

Full Access
Question # 7

What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

A.

Scheduling agreement schedule line

B.

Purchase Order

C.

Planned Order

D.

Production Order

Full Access
Question # 8

Which time elements are relevant for lead time scheduling of a production order? Note:

There are 2 correct answers to this question.

A.

setup time

B.

Opening Period

C.

Float after Production

D.

Total replenishment lead time

Full Access
Question # 9

Which master data object governs the relationship between supply source and demand source in the Kanban process?

A.

Replenishment strategy

B.

Production supply area

C.

Control cycle

D.

Rate routing

Full Access
Question # 10

You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?

A.

Manual Planning Without Check

B.

Consumption-Based Planning

C.

Material Requirements Planning

D.

Advanced Planning

Full Access
Question # 11

What is the work center hierarchy in capacity planning?

A.

A group of work center in a parallel sequence that is used to split production quantities and work on them in parallel

B.

A group of alternative work centers providing a cumulative available capacity for production

C.

A group of work centers in a production line being used in sequence for production

D.

A group of alternative work centers for production, structured in hierarchy levels by priorities

Full Access
Question # 12

What does the material type influence?

Note: There are 2 correct answers to this question.

A.

Which document types and class categories are allowed

B.

Which material master screens appear and in which sequence

C.

Whether the material is produced in-house, procured externally, or both

D.

Which plant-specific and plant-independent statuses are allowed

Full Access
Question # 13

Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

A.

Move Time

B.

Pick/pack time

C.

Setup time

D.

Float before production

E.

Queue time

Full Access
Question # 14

What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

A.

Order type

B.

Planning strategy

C.

Requirements profile

D.

Requirements type

Full Access
Question # 15

How can you set up the supply source for the Kanban process in SAP S/4HANA?

Note: There are 3 correct answers to this question.

A.

Use stock transfer reservations for stock transfer.

B.

Use purchase orders for external procurement.

C.

Use quotations for internal and external procurement

D.

Use run schedule quantities for in-house production.

E.

Use purchasing costs for automated source prioritization.

Full Access
Question # 16

You want to set up a make-to-order planning scenario for a finished material. The bill of materialcontains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

A.

Choose planning strategy 50 (Planning without final assembly) and select the — corresponding Individual/Collective indicator.

B.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.

C.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.

D.

Choose planning strategy 20 (Make-to-Order) and select the corresponding ndividual/Collectiveindicator.

Full Access
Question # 17

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,

A.

By Plant

B.

By Period

C.

By Industry

D.

By Material Status

Full Access
Question # 18

If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

A.

Fill up to the maximum stock level.

B.

Fill up to the safety stock level.

C.

Fill up based on the lot size procedure.

D.

Fill up to the reorder stock level.

Full Access
Question # 19

Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

A.

To increase the number of planning levels

B.

To simplify the structure of bills of material

C.

To reduce the number of material masters

D.

To make the assignment of components easier

E.

To reduce the number of changes required in bills of material

Full Access
Question # 20

Which of the following elements does MRP take into account during net requirement

calculation? Note:

There are 2 correct answers to this question.

A.

Forecast key figures

B.

Safety Stock

C.

Maximum stock level

D.

Purchase orders

Full Access
Question # 21

What are the options if the Dispatched operation status is set for a production order operation?

Note: There are 2 correct answers to this question.

A.

You can reschedule the operation using finite scheduling in a planning table.

B.

You can reschedule the operation in the Manage Production Operations app.

C.

You can reschedule the operation using infinite scheduling in a planning table

D.

You can reschedule the operation using midpoint scheduling in a planning table.

Full Access
Question # 22

Which time elements can be reduced by a reduction strategy?

Note: There are 3 correct answers to this question.

A.

Goods receipt processing time

B.

Move time

C.

Wait time

D.

Float after production

E.

Queue time

Full Access
Question # 23

Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.

A.

Resource matrix

B.

Resource network

C.

Resource hierarchy

D.

Resource selection

Full Access
Question # 24

Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing?

Note: There are 2 Correct answers to this question?

A.

Run MRP with quota arrangement

B.

Run PP/DS heuristic for repetitive manufacturing

C.

Assign planned orders manually in the planning table

D.

Assign planned orders manually in the planning table

Full Access