C_TS422_2021 Exam Dumps - SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing

Question # 4

Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

A.

First in first out (FIFO)

B.

100% check

C.

Simultaneous

D.

By usage probability

Full Access
Question # 5

How can you limit the validity of a bill of material (BOM)?

A.

By plant

B.

By material type

C.

By industry

D.

By period

Full Access
Question # 6

You set up a material as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)?

A.

Change the special procurement key of the phantom assembly in the BOM.

B.

Change the explosion type of the phantom assembly in the BOM.

C.

Change the phantom item indicator for the phantom assembly in the BOM.

D.

Change the item category of the phantom assembly in the BOM.

Full Access
Question # 7

Which business processes are affected by setting in the order type-dependent parameters?

A.

Intiate quality inspections.

B.

Select master data.

C.

Define integration to cost accounting.

D.

Implement engineering changes.

Full Access
Question # 8

You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?

A.

Model a transportation resorce in the location master.

B.

Model a seperate resource in the production data structure.

C.

Model a resource inbound in the location master.

D.

Model a handling resource in the location master and goods receipt time in the material master.

Full Access
Question # 9

What is a work center hierarchy in planning in SAP S/4HANA?

A.

A group of alternative work centers providing a cumulative available capacity for production.

B.

A group of alternative work centers for production, structured in hierarchy levels by priorities

C.

A group of work centers in a production line being used in sequence for production

D.

A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel

Full Access
Question # 10

Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?

A.

Posting of production costs to the production cost collector

B.

Material staging for nex order in sequence

C.

Archiving of documents for assembly scrap

D.

Posting of goods receipt for the product

E.

Reduction of associated capacity requirements

Full Access
Question # 11

Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

A.

Create object selection variant for transportation lane-related alerts.

B.

Create object selection variant for product-related alerts.

C.

Assign the overall profile to the authorization profile.

D.

Assign the alert profile to the overall profile.

Full Access
Question # 12

You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

A.

Material requirements planning

B.

Manual planning without check

C.

Forecast planning

D.

Consumption-based planning