API-SIEE Exam Dumps - Source Inspector Electrical Equipment

Searching for workable clues to ace the API API-SIEE Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s API-SIEE PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 9

Which enclosure type is defined in the guide as a construction where free exchange of air is prevented between the inside and outside of the motor?

A.

Open drip proof

B.

TEFC

C.

WP-II

D.

Purged pressurized

Full Access
Question # 10

According to ANSI/NETA ATS, the inspector should verify the fuse and circuit breaker sizes and types correspond to which of the following?

A.

Transformer nameplate

B.

Shutter installation operation

C.

One-line drawing

D.

Current transformer turns ratio

Full Access
Question # 11

According to the guide definitions, a junction box used within a control building or instrument enclosure may also be referred to as an:

A.

interface box

B.

breaker cubicle

C.

bus duct

D.

starter cell

Full Access
Question # 12

According to the referenced API standard in the guide, special purpose induction motors covered by API STD 541 are:

A.

100 hp and larger

B.

250 hp and larger

C.

375 kW (500 hp) and larger

D.

1000 kW and larger only

Full Access
Question # 13

The evaluation of a component for compliance with product specification and data sheet is known as:

A.

standardization.

B.

inspection.

C.

validation.

D.

documentation.

Full Access
Question # 14

Before starting surveillance, the source inspector should confirm that the supplier/vendor has:

A.

only the latest code editions, regardless of contract requirements

B.

the most current project documents specified in the engineering design

C.

only verbal instructions from procurement

D.

internal procedures but not drawings

Full Access
Question # 15

Why should the dates for source inspection scheduled work process events such as the pre-inspection meeting, key inspection events and anticipated shipping date be identified in advance?

A.

To allow coordination with other project members involved in the activity

B.

To ensure that all dates will meet the project schedule and quality requirements

C.

To provide a sound basis for inspection and test planning for each shop

D.

To be able to assign inspectors to the shops in order not to conflict with other projects

Full Access
Question # 16

What is an insulation resistance test?

A.

A test that determines the adequacy of electrical insulation for the normally occurring over voltage transient

B.

A test that determines the corrosive contaminants around the conductors, terminal spacing problems, and tolerance errors in cables

C.

A spot overvoltage test which uses an applied DC voltage to measure ohms

D.

A test that determines the voltage that electrical insulation can withstand during normal operation

Full Access