An architect is documenting the logical design for a new vSphere solution. The following requirements have been provided to the architect by the customer for the design:
The solution must be deployed in two locations: DC1 and DC2
The solution must limit the impact radius of accidental changes by administrators
The solution must meet a recovery time objective (RTO) of four (4) hours and recovery point objective (RPO) of 24Â hours
The solution must allow workloads to run in both DC1 and DC2 during normal operations
The solution must allow workloads to be moved bi-directionally between DC1 and DC2
The solution must use hyper-converged infrastructure for the virtual machine storage
The customer has also confirmed that the network connection between DC1 and DC2 has a 10Â Gbps bandwidth with a maximum round trip latency of 4Â ms.
The architect recommends the following design decision:
Use separate clusters in DC1 and DC2 to form a multi-region design
What should the architect include as justification for this design decision?
The following is a list of requirements from a discovery workshop for a new VMware hosting platform system design:
REQ001 - The architecture must support recoverability to the VMware Cloud Disaster Recovery (VCDR) service.
REQ002 - The architecture must support high availability (HA) and fault tolerance (FT).
REQ003 - The architecture must support reducing existing energy consumption and carbon footprint.
REQ004 - The architecture must provide support for network virtualization using distributed virtual switches.
Which requirement would be classified as a business (formerly functional) requirement?
An architect has made the following assumptions:
The customer will provide licensing for the vSphere platform.
The storage hardware has sufficient capacity for future workload scale.
The data center offers sufficient power, cooling and rack space for workload scale.
Which two risks must be documented in the design document in response to these assumptions? (Choose two.)
An architect is designing a vSphere-based application hosting solution in a brownfield site.
The following information has been provided during the requirements gathering workshop:
The solution should support 5,000 compute workloads across two physical sites.
The CFO has approved budget for the purchase of new server and network hardware only.
The existing storage array is currently Fibre Channel connected with 2 x 8Â Gbps interfaces to a dedicated Storage Area Network (SAN) fabric.
The existing storage array does not support integration with vSphere API for Storage Awareness.
The existing storage array can be configured to support NFS storage.
The existing vSphere administration team will responsible for operational management of the new solution.
Which storage technology should the architect recommend based on these requirements?
An architect is working on a new VMware vSphere design and notes the following information during interviews with stakeholders:
The company has previously worked with multiple VMware partners
The company has an internal security policy that is referenced in long running contracts
The company has an Enterprise License Agreement (ELA) with VMware
The company has a multi-year cloud subscription agreement
Which of these is a business factor that will impact this design?
A company is expanding and will be deploying new vSphere environments in multiple new locations. All environments use datastores backed by multiple storage technologies and vendors.
How can the architect create a design to efficiently and repeatedly distribute existing company virtual machine (VM) templates to multiple new locations?
An architect is designing the virtual networking components of a vSphere-based solution that will provide an environment for the development of a new latency sensitive stock trading application.
The following information was identified within the initial meeting with the customer:
The customer has vCenter Standard and vSphere Standard licenses left over from a previous project.
The customer's CFO has approved budget for additional purchases, if required.
The following requirements were also identified during the meeting:
The solution must support 500 development workloads concurrently running in the secondary site.
The solution must support the ability to complete all vSphere Operational Management centrally.
The solution must ensure business-critical applications are not impacted by vSphere system-level operations.
Given the requirements, the architect has decided on a single 20-node cluster for development.
Which three additional design decisions should the architect make to meet these requirements? (Choose three.)
Refer to the exhibit.
An architect is assigned a new project to design a VMware hybrid cloud solution.
The project is following a proven design methodology following the V-Model of systems engineering and verification. The selected methodology follows these phases: Assess, Design, Deploy and Validate.
Which activity would be conducted during the Design phase?