Searching for workable clues to ace the Cisco 300-610 Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s 300-610 PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps
A database administrator experiences delay when performing storage replication between primary and secondary data centers. The data centers are located 20 kilometers apart and are connected using a 500 Mbps link. The deployment was implemented using an FCIP tunnel and a pair of Cisco MDS 9250 Series Switches. The network engineer decided to enable QoS to prioritize replication traffic. Which QoS model must be used to resolve the performance issues?
A company is using Cisco UCS and wants a network orchestration solution to meet these requirements :
centrally manage compute and storage platforms
reduce the time it takes to detect an outage
easily exchange data with TAC to reduce resolution times
The company does not have in-house knowledge about scripting. Which solution must the company choose?
A network engineer designs a Cisco Nexus data center network for a client-server farm using a pair of Nexus 9000 Series. Switches In a vPC setup. Each server connects with two interfaces to both Nexus switches. The Nexus switches must always initiate the negotiation with the server. Which feature should be used in this design to ensure traffic is forwarded from the server to the data center network?
Refer to the exhibit. A Cisco engineer is configuring a Cisco UCS integrated infrastructure for SAP HANA that consists of 8 x Cisco UCS B/C480-M5 servers for SAP HAN A and 4 x Cisco UCS C240-M5 C-Series rack mount servers for storage. The rack servers are equipped with Cisco VIC 1225T. The engineer plans to install RHEL8. but the boot process is interrupted at installation because the iSCSl LUNs are not recognized by the VIC adapter. After proper Investigation, the engineer concludes that the initiator and target configuration that is programmed on the primary ISCSl VNIC to the operating system Is missing. What is the reason for the issue?
Drag and drop the configurations from the left onto the correct policies on the right.
