Special Weekend Sale - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 75vsure

2V0-17.25 Exam Dumps - VMware Cloud Foundation 9.0 Administrator

Searching for workable clues to ace the VMware 2V0-17.25 Exam? You’re on the right place! ExamCert has realistic, trusted and authentic exam prep tools to help you achieve your desired credential. ExamCert’s 2V0-17.25 PDF Study Guide, Testing Engine and Exam Dumps follow a reliable exam preparation strategy, providing you the most relevant and updated study material that is crafted in an easy to learn format of questions and answers. ExamCert’s study tools aim at simplifying all complex and confusing concepts of the exam and introduce you to the real exam scenario and practice it with the help of its testing engine and real exam dumps

Go to page:
Question # 17

An organization has a mix of internally developed commercially packaged and open-source applications within their VMware Cloud Foundation (VCF) environment. Management has requested a plan to monitor these applications in a simple, consolidated manner.

What two VCF solutions could be implemented to satisfy this request? (Choose two.)

A.

VCF Operations Service Discovery

B.

VCF Operations for Applications

C.

VCF Operations Application Discovery

D.

VCF Operations for Logs

E.

VCF Operations for Logs Content Packs

Full Access
Question # 18

An administrator is deploying a new VCF instance in an existing fleet. Which three components must be deployed? (Choose three.)

A.

vCenter

B.

vSphere Supervisor

C.

VCF Automation

D.

NSX Manager

E.

SDDC Manager

F.

VCF Installer

Full Access
Question # 19

An administrator has been tasked with configuring the external connectivity for a Virtual Private Cloud (VPC) within a new VMware NSX project. The Transit Gateway (TGW) associated with the project will use VLAN(s) and external subnets to connect the VPC to the physical routers.

What prerequisite must the administrator ensure is completed before starting the configuration of the external connection?

A.

TWO BGP Peers must be set up on the Distributed TGW for dynamic routing.

B.

The vSphere cluster must have a Transport Node Profile (TNP) attached to it.

C.

All the hosts running VPC workloads must have access to the VLAN(s) used by the Distributed TGW.

D.

All the hosts running VPC workloads must have access to the Edge TEP network.

Full Access
Question # 20

An administrator has been tasked with deploying a new VMware Cloud Foundation (VCF) instance using a supported VCF Operations model that has the smallest possible resource footprint.

Which VCF Operations deployment model should the administrator use?

A.

Stretched Cluster

B.

Simple

C.

Continuous Availability

D.

High Availability

Full Access
Question # 21

As part of a new VMware Cloud Foundation (VCF) fleet, an administrator is tasked to deploy vSphere Supervisor utilizing VMware NSX networking. Which networking connectivity type should the administrator configure?

A.

Avi Load Balancer Controller IPs

B.

Data Network Subnet

C.

Distributed Gateway

D.

Centralized Gateway

Full Access
Question # 22

An administrator configures a new VMware NSX overlay segment for a new pool of virtual desktops to connect to with default segment policies. The virtual desktops will obtain an IPv4 address from a DHCP server connected to the same segment.

Which action must the administrator take to ensure IPv4 lease addresses can be successfully obtained from the DHCP server?

A.

Clone the default segment security profile, configure the DHCP server block to No on the cloned profile and apply it to the segment.

B.

Edit the default IP discovery profile, configure the DHCP server block to No and apply it to the segment.

C.

Clone the default IP discovery profile, configure the DHCP server block to No on the cloned profile and apply it to the segment.

D.

Edit the default segment security profile, configure the DHCP server block to No and apply it to the segment.

Full Access
Question # 23

A security team informed an administrator that a VMware vCenter root password was compromised. As a precaution, the password was changed directly in vCenter. What should an administrator do to regain management capability of this vCenter by VCF Operations?

A.

Enter the new root password using the Reset password function in VCF Operations.

B.

Use the Rotate password function in VCF Operations.

C.

Enter the new root password using the Update password function in VCF Operations.

D.

Enter the new root password using the Remediate password function in VCF Operations.

Full Access
Question # 24

What is the purpose of Istio Service Mesh?

A.

Provides service discovery across multiple clusters.

B.

Provides an infrastructure layer that makes communication between applications possible, structured, and observable.

C.

Provides dynamic application load balancing and autoscaling across multiple clusters and sites.

D.

Provides a centralized, global routing table to simplify and optimize traffic management.

Full Access
Go to page: