You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step. Where can you change this during the migration via the Utilities option of the SUM UI? Note: There are 2 correctanswersto this question.
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3 correctanswersto this question.
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correctanswersto this question.
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?