Question # 4

A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.

Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?

A.

Infinite resource and infinite strategy

B.

Finite resource and finite strategy

C.

Finite resource and infinite strategy

D.

Infinite resource and finite strategy

Full Access
Question # 5

What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

A.

Quantity

B.

Scrap percentage

C.

Installation point

D.

Item type

Full Access
Question # 6
A.

Process order Control recipe PI sheet Process message

B.

Process order Control recipe Process message PI sheet

C.

Control recipe Process order PI sheet Process message

D.

Control recipe Process order Process message PI sheet

Full Access
Question # 7

Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

A.

Sales order-specific planning run is required.

B.

Sales order-specific stock is created

C.

Net requirements calculation is sales order-specific.

D.

Storage location MRP areas are required.

E.

Production orders are created with sales order reference.

Full Access
Question # 8

In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.

A.

Use a specific material status.

B.

Use a specific MRP controller.

C.

Use a specific material group

D.

Use a specific MRP type.

Full Access
Question # 9

Before a user can add multiple production versions in a material master, what information should be collected?

There are 3 correct answers to this question.

A.

Validity dates

B.

Lot sizes

C.

BOM status

D.

Work center hierarchy

E.

Task list group number

Full Access
Question # 10

You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

A.

The new operation is inserted at the desired time; the previously dispatched operation is moved forward.

B.

The new operation is inserted at the desired time the previously dispatched operation is moved backward.

C.

The previously dispatched operation stays as is the new operation is inserted after the dispatched operation.

D.

The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.

Full Access
Question # 11

Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

A.

Maximum stock level

B.

Purchase orders

C.

Safety stock

D.

Lot size

Full Access
Question # 12

What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.

A.

Comparison of current data with historical data to identify trends

B.

Automatic update of story boards

C.

Strategic analysis

D.

Real time decision support

Full Access
Question # 13

Where can you find the latest in version of the Simplification List for SAP S/4HANA?

Please choose the correct answer.

A.

SAP Solution Manager 7.2

B.

SAP Help Portal

C.

SAP Support Portal

D.

SAP Best Practices Explorer

Full Access
Question # 14

You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.

A.

/SAPAPO/UPD_LOC_SP_PL

B.

/SAPAPO/CURTO_CREATE

C.

/SAPAPO/PPDS_DELTA_ORD_TRANS

D.

/SAPAPO/CREATE_LOCATION

Full Access
Question # 15

Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question.

A.

MRP Live can priorities demand from sales orders

B.

MRP Live can propose alternative solutions

C.

MRP Live can create production orders automatically

D.

MRP Live can plan materials with recursive BOMs

Full Access
Question # 16

What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

A.

Alternative resources are fully occupied.

B.

The Change Planning Direct on indicator is set.

C.

The work center has several individual capacities.

D.

The planning strategy is infinite.

Full Access
Question # 17

MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

A.

It is converted into a production order.

B.

It is converted into a reservation.

C.

It is converted into a planned order.

D.

It is converted into a schedule line.

Full Access
Question # 18

In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

A.

MRP type

B.

MRP group

C.

MRP controller

D.

MRP planning file

Full Access
Question # 19

If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?

A.

Fill up to the maximum stock level

B.

Fill up to the reorder stock level

C.

Fill up based on the lot size procedure

D.

Fill up to the safety stock level

Full Access
Question # 20

You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

A.

Top of Red Base

B.

Top of Red

C.

Top of Green

D.

Top of Yellow

Full Access
Question # 21

Where do you maintain the duration of a product on operation?

A.

Bill of material (BOM)

B.

Work instructions

C.

Material master

D.

Routing

Full Access
Question # 22

When a developer creates a new SAP Fiori app, they begin by selecting a template to ensure the application has a consistent look-and-feel. What types of templates can a developer choose? There are 3 correct answers to this question.

A.

Transactional

B.

Factsheet

C.

Web Dynpro

D.

Analytical

E.

Maintenance view